Supply network planning in the forest supply chain with bucking decisions anticipation

被引:11
|
作者
Chauhan, Satyaveer S. [2 ]
Frayret, J. -M. [1 ,3 ]
LeBel, Luc [3 ,4 ]
机构
[1] Ecole Polytech Montreal, Dept Math & Genie Ind, Montreal, PQ, Canada
[2] Concordia Univ, Dept Decis Sci & Management Informat Syst, John Molson Sch Business, Montreal, PQ, Canada
[3] Univ Laval, Consortium Rech FOR C, Quebec City, PQ, Canada
[4] Univ Laval, Fac Foresterie & Geomat, Quebec City, PQ G1K 7P4, Canada
关键词
Supply network planning; Bucking; Integer programming; Heuristic; Forest supply chain; Columns generation; TREE BUCKING; LOG BUCKING; TABU SEARCH; OPTIMIZATION; LEVEL; SYSTEM; CONSTRAINTS; MANAGEMENT; ALLOCATION; DEMAND;
D O I
10.1007/s10479-009-0621-5
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a two-echelon timber supply chain in which the first echelon consists of several stands to be harvested and the second echelon consists of mills to be supplied with logs of different length. This problem aims at minimizing harvesting and transportation costs for one production period, while satisfying demand expressed as a mix of volumes of specific log types. Harvesting cost, which includes felling, bucking and hauling to roadside, depends upon the number of log type to be produced and sorted. Each stand to be harvested is modeled individually with a limited number of trees of various classes of diameter and total length, which affects the productivity factors of the bucking patterns to be used. To take these characteristics into account, we propose heuristics based on columns generation to solve the supply network problem at the forest level with an anticipation of bucking operations at the stand level.
引用
收藏
页码:93 / 115
页数:23
相关论文
共 50 条
  • [21] Value of IT in supply chain planning
    Fuchs, Christoph
    Otto, Andreas
    JOURNAL OF ENTERPRISE INFORMATION MANAGEMENT, 2015, 28 (01) : 77 - 92
  • [22] Possibilistic linear-programming approach for supply chain networking decisions
    Kabak, Ozgur
    Ulengin, Fusun
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 209 (03) : 253 - 264
  • [23] Optimizing the credit term decisions in supply chain finance
    Li, Haitao
    Mai, Liuqing
    Zhang, Wenlong
    Tian, Xiangyu
    JOURNAL OF PURCHASING AND SUPPLY MANAGEMENT, 2019, 25 (02) : 146 - 156
  • [24] Quantity decisions in a supply chain with early returns remanufacturing
    Li, Xiang
    Li, Yongjian
    Cai, Xiaoqiang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (08) : 2161 - 2173
  • [25] Use of Lagrangian decomposition in supply chain planning
    Lidestam, Helene
    Ronnqvist, Mikael
    MATHEMATICAL AND COMPUTER MODELLING, 2011, 54 (9-10) : 2428 - 2442
  • [26] A Multidisciplinary Review of Collaborative Supply Chain Planning
    Frayret, Jean-Marc
    2009 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC 2009), VOLS 1-9, 2009, : 4414 - 4421
  • [27] Biomass Power Generation Supply Chain Planning
    Ji, Jirasak
    Sittibud, Nammon
    Raoupatham, Vorakrit
    Nananukul, Narameth
    2017 IEEE INTERNATIONAL CONFERENCE ON SMART GRID AND SMART CITIES (ICSGSC), 2017, : 115 - 119
  • [28] An integrated approach for sustainable supply chain planning
    Boukherroub, Tasseda
    Ruiz, Angel
    Guinet, Alain
    Fondrevelle, Julien
    COMPUTERS & OPERATIONS RESEARCH, 2015, 54 : 180 - 194
  • [29] Integrated approach for the bucking and production planning problems in forest industry
    Vanzetti, Nicolas
    Broz, Diego
    Montagna, Jorge M.
    Corsano, Gabriela
    COMPUTERS & CHEMICAL ENGINEERING, 2019, 125 : 155 - 163
  • [30] Stochastic programming to evaluate the benefits of coordination mechanisms in the forest supply chain
    Simard, Vanessa
    Ronnqvist, Mikael
    Lebel, Luc
    Lehoux, Nadia
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 184