Modeling optimal thresholds for minimum traffic guarantee in public-private partnership (PPP) highway projects

被引:4
作者
Wu, Zhenyao [1 ,3 ]
Hanaoka, Shinya [2 ]
Shuai, Bin [3 ]
机构
[1] Guizhou Commun Polytech, Guiyang, Peoples R China
[2] Tokyo Inst Technol, Sch Environm & Soc, Tokyo, Japan
[3] Southwest Jiaotong Univ, Sch Transportat & Logist, Chengdu, Peoples R China
关键词
REAL OPTIONS; REVENUE GUARANTEE; GOVERNMENT GUARANTEES; RISK;
D O I
10.1080/0013791X.2021.2015498
中图分类号
F [经济];
学科分类号
02 ;
摘要
Optimal upper and lower thresholds model for traffic guarantee are proposed to optimize the risk allocation between a government and a concessionaire considering the perspective of lenders and the risk tolerances of the participants. In this study, the condition for the lender to provide the loan is that the default probability of the project does not exceed the acceptable maximum default probability of the lender. The proposed model uses risk weights to reflect the risk tolerances of government and the concessionaire and adopts a Gini coefficient for risk to describe the rationality of risk allocation. The application of the model to a highway project shows that a traffic guarantee with optimal thresholds effectively balances the project risks for both the government and concessionaire.
引用
收藏
页码:52 / 74
页数:23
相关论文
共 47 条
[1]  
Alexander I., 2000, Utilities Policy, V9, P1, DOI DOI 10.1016/S0957-1787(00)00006-0
[2]  
[Anonymous], 2007, New generation whole-life costing: Property and construction decision-making under uncertainty
[3]  
[Anonymous], 2008, Public-Private Partnership (PPP) Handbook
[4]  
[Anonymous], 2013, East Asia Projects for Transparency
[5]   Risk-Neutral Pricing Approach for Evaluating BOT Highway Projects with Government Minimum Revenue Guarantee Options [J].
Ashuri, B. ;
Kashani, H. ;
Molenaar, K. R. ;
Lee, S. ;
Lu, J. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (04) :545-557
[6]   Error and optimism bias in toll road traffic forecasts [J].
Bain, Robert .
TRANSPORTATION, 2009, 36 (05) :469-482
[7]   PRICING OF OPTIONS AND CORPORATE LIABILITIES [J].
BLACK, F ;
SCHOLES, M .
JOURNAL OF POLITICAL ECONOMY, 1973, 81 (03) :637-654
[8]  
Bovaird Tony., 2009, PUBLIC MANAGEMENT GO, V2nd
[9]   The option value of government guarantees in infrastructure projects [J].
Brandao, Luiz Eduardo T. ;
Saraiva, Eduardo .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (11) :1171-1180
[10]   Optimized real options-based approach for government guarantees in PPP toll road projects [J].
Buyukyoran, Faruk ;
Gundes, Selin .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2018, 36 (04) :203-216