Relationship between track stiffness and dynamic performance of vehicle-track-bridge system

被引:27
作者
Chen, Zhaowei [1 ]
机构
[1] Chongqing Jiaotong Univ, Sch Mechanotron & Vehicle Engn, Chongqing, Peoples R China
基金
中国博士后科学基金;
关键词
Vehicle-track-bridge dynamic interaction; high-speed railway; track stiffness irregularity; pitch movement; vehicle dynamics; PIER SETTLEMENT; TRAIN;
D O I
10.1080/00423114.2020.1792942
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Track stiffness irregularity is superficially invisible on rail surface, while causes dynamical impact and track deformation when trains running through. Aiming at this issue, this work presents an investigation on the influence of track stiffness on dynamic behaviours of the high-speed vehicle-track-bridge dynamic system. Primarily, a determination method of track stiffness irregularity is analytically deduced, in which a novel solution of deformation of free beam is proposed. Then a high-speed vehicle-track-bridge dynamic interaction model is established based on the vehicle-track-bridge dynamic interaction theory. On this basis, the influence of track stiffness on the dynamic behaviours of the coupled system is investigated both in time domain and in frequency domain. Results show that the distribution of track stiffness in longitudinal direction indeed affects the vibrations of the system. More vibration details of system in full frequency bands can be revealed by considering track elasticity. The most sensitive indicator to different track types is the pitch acceleration of bogie. The wave amplitude caused by length of slab is very small, however its influence on vehicle vibrations is great, indicating that tiny track stiffness change caused by length of slab cannot be ignored in dynamic investigations.
引用
收藏
页码:1825 / 1843
页数:19
相关论文
共 25 条
[1]  
蔡成标, 1997, 西南交通大学学报, V32, P628
[2]  
[Anonymous], 1964, Introduction to Structural Dynamics
[3]  
[Anonymous], 1973, DYNAMICS ENG STRUCTU
[4]   Conserving energy and momentum in nonlinear dynamics: A simple implicit time integration scheme [J].
Bathe, Klaus-Jurgen .
COMPUTERS & STRUCTURES, 2007, 85 (7-8) :437-445
[5]   A substructure approach for the dynamic analysis of train-track-bridge system [J].
Biondi, B ;
Muscolino, G ;
Sofi, A .
COMPUTERS & STRUCTURES, 2005, 83 (28-30) :2271-2281
[6]   Dynamic behaviour of railway fastening setting pads [J].
Carrascal, I. A. ;
Casado, J. A. ;
Polanco, J. A. ;
Gutierrez-Solana, F. .
ENGINEERING FAILURE ANALYSIS, 2007, 14 (02) :364-373
[7]   Comparison of single-pier settlement model and multi-pier settlement model in solving train-track-bridge interaction [J].
Chen, Zhaowei ;
Bi, Lin ;
Zhao, Jiangwei .
VEHICLE SYSTEM DYNAMICS, 2021, 59 (10) :1484-1508
[8]   Theoretical method of determining pier settlement limit value for China's high-speed railway bridges considering complete factors [J].
Chen, Zhaowei ;
Zhai, Wanming .
ENGINEERING STRUCTURES, 2020, 209
[9]   Analysis of structural stresses of tracks and vehicle dynamic responses in train-track-bridge system with pier settlement [J].
Chen, Zhaowei ;
Zhai, Wanming ;
Yin, Qiang .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2018, 232 (02) :421-434
[10]   Study on the safe value of multi-pier settlement for simply supported girder bridges in high-speed railways [J].
Chen, Zhaowei ;
Zhai, Wanming ;
Tian, Guoying .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2018, 14 (03) :400-410