A path-relinking approach for a bi-criteria disassembly sequencing problem

被引:39
作者
Adenso-Diaz, Belarmino [1 ]
Garcia-Carbajal, Santiago [1 ]
Gupta, Surendra M. [2 ]
机构
[1] Univ Oviedo, Escuela Politecn Super Ingn, Gijon 33204, Spain
[2] Northeastern Univ, Dept Mech & Ind Engn, Boston, MA 02115 USA
关键词
reverse logistics; disassembly sequence problem; GRASP; path relinking; multicriteria;
D O I
10.1016/j.cor.2007.06.002
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The first crucial step of product recovery is disassembly. Some product disassembly is almost always needed in remanufacturing, recycling, and disposal. Since disassembly tends to be expensive, disassembly sequence planning becomes important in minimizing resources (time and money) invested in disassembly and maximizing the level of automation. A disassembly sequence plan (DSP) is a sequence of disassembly tasks, which begins with a product to be disassembled and terminates in a state where all of the parts of interest are separated. The decision version of the problem of finding the optimal DSP is an NP-complete problem and therefore complex and challenging to solve. Often one has to resort to heuristic and metaheuristic techniques for solving such problems. In this paper, we seek a DSP that addresses two criteria in order. First, we look for a sequence, the cost of which is close to our cost aspiration. Second, we look for a sequence that prioritizes some selected parts to be disassembled as early as possible. We propose a greedy randomized adaptive search procedure (GRASP) and path-relinking-based heuristic methodology specifically developed to solve such bi-criteria type of disassembly problem. An example is considered to illustrate the implementation of the methodology. Conclusions drawn include the consistent generation of near-optimal solutions, the ability to preserve precedence, the superior speed of the metaheuristic, and its practicality due to its ease of implementation. (c) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:3989 / 3997
页数:9
相关论文
共 28 条
[1]   An efficient GRASP algorithm for disassembly sequence planning [J].
Adenso-Diaz, Belarmino ;
Garcia-Carbajal, Santiago ;
Lozano, Sebastian .
OR SPECTRUM, 2007, 29 (03) :535-549
[2]  
[Anonymous], 2005, ST LUCIE PRESS SERIE
[3]   Effectiveness of planning and control systems: an empirical study of US and Japanese firms [J].
Sheu, CW ;
Wacker, JG .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (05) :887-905
[4]  
Glover F., 2003, HDB METAHEURISTICS
[5]  
GONZALEZ B, 2005, COMPUTERS OPERATIONS, V33, P1776
[6]   Issues in environmentally conscious manufacturing and product recovery: a survey [J].
Gungor, A ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 36 (04) :811-853
[7]   An evaluation methodology for disassembly processes [J].
Gungor, A ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (1-2) :329-332
[8]   Disassembly sequence planning for products with defective parts in product recovery [J].
Gungor, A ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 35 (1-2) :161-164
[9]   SCHEDULING DISASSEMBLY [J].
GUPTA, SM ;
TALEB, KN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) :1857-1866
[10]   Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality [J].
Kim, HJ ;
Lee, DH ;
Xirouchakis, P .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (01) :195-212