A study on the effect of flaw detection probability assumptions on risk reduction achieved by non-destructive inspection

被引:13
作者
Cronvall, O. [1 ]
Simola, K. [1 ]
Mannisto, I. [1 ]
Gunnars, J. [2 ]
Alverlind, L. [2 ]
Dillstrom, P. [2 ]
Gandossi, L. [3 ]
机构
[1] VTT, Tech Res Ctr Finland, Espoo 02044, Finland
[2] Inspecta Technol AB, Stockholm, Sweden
[3] Joint Res Ctr, Inst Energy, NL-1755 ZG Petten, Netherlands
关键词
Inspection reliability; Probability of detection curves (POD); Risk-informed in-service inspection; Probabilistic fracture mechanics (PFM); BREAK; IGSCC;
D O I
10.1016/j.ress.2012.03.012
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Leakages and ruptures of piping components lead to reduction or loss of the pressure retaining capability of the system, and thus contribute to the overall risk associated with nuclear power plants. In-service inspection (ISI) aims at verifying that defects are not present in components of the pressure boundary or, if defects are present, ensuring that these are detected before they affect the safe operation of the plant. Reliability estimates of piping are needed e.g., in probabilistic safety assessment (PSA) studies, risk-informed ISI (RI-ISI) applications, and other structural reliability assessments. Probabilistic fracture mechanics models can account for ISI reliability, but a quantitative estimate for the latter is needed. This is normally expressed in terms of probability of detection (POD) curves, which correlate the probability of detecting a flaw with flaw size. A detailed POD curve is often difficult (or practically impossible) to obtain. If sufficient risk reduction can be shown by using simplified (but reasonably conservative) POD estimates, more complex PODs are not needed. This paper summarises the results of a study on the effect of piping inspection reliability assumptions on failure probability using structural reliability models. The main interest was to investigate whether it is justifiable to use a simplified POD curve. Further, the study compared various structural reliability calculation approaches for a set of analysis cases. The results indicate that the use of a simplified POD could be justifiable in RI-ISI applications. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:90 / 96
页数:7
相关论文
共 14 条
[1]   A procedure for estimation of pipe break probabilities due to IGSCC [J].
Bergman, M ;
Brickstad, B ;
Nilsson, F .
INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 1997, 74 (03) :239-248
[2]   A PROCEDURE FOR ANALYSIS OF LEAK BEFORE BREAK IN PIPES SUBJECTED TO FATIGUE OR IGSCC ACCOUNTING FOR COMPLEX CRACK SHAPES [J].
BERGMAN, M ;
BRICKSTAD, B .
FATIGUE & FRACTURE OF ENGINEERING MATERIALS & STRUCTURES, 1995, 18 (10) :1173-1188
[3]  
Brickstad B, 2003, WP4 NURBIM
[4]  
*BRIT EN GEN LTD, 2001, ASS INT STRUCT CONT
[5]  
Busch M., 1995, Z1195 IWM
[6]  
Busch M, 1994, T1894 IWM
[7]  
Cronvall O, 2007, VTT RES NOTES
[8]   Combining discrete-time Markov processes and probabilistic fracture mechanics in RI-ISI risk estimates [J].
Cronvall, Otso ;
Mannisto, Ilkka .
INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 2009, 86 (11) :732-737
[9]  
Dillstrom P, 2007, 200743 SKI
[10]  
Gandossi L, 2007, 21902EN EUR