Modularity, Lead time and Return Policy for Supply Chain in Mass Customization System

被引:6
作者
Li, Jizi [1 ]
Liu, Chunling [1 ]
Xiao, Weichun [1 ]
机构
[1] Wuhan Textile Univ, CSC Networks Syst Res Ctr, Wuhan 430073, Hubei Province, Peoples R China
基金
美国国家科学基金会;
关键词
Mass customization; supply chain; return policy; modularity; lead time; PRODUCT; OPTIMIZATION; DESIGN; ENVIRONMENTS; COMPETITION; MODEL;
D O I
10.1080/18756891.2016.1256575
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Mass Customization (MC) is a flexible manufacturing system with features of Mass Production (MP) and Customization Production (CP). However, there is few researches about competition & cooperation between the upstream MP firm (module manufacturer) and downstream CP firm (assembler) under MC supply chain scenario. From supply chain perspective, this paper first develops the base models considering the influences of return policy, modularity level, production lead time and pricing factors. Furthermore, according to the different decision-making situations, three kinds of MC supply chain models in competitive or cooperative environment (i.e. simultaneous-move game, sequential-move game and the cooperative game) have been built, then, the optimal solution of each model have been analyzed and compared, and coordination mechanism is design to cooperate in MC supply chain via profit-sharing with Nash bargaining power. Finally, through the numerical analysis, we find the highest profit is from the cooperative setting, then followed by in simultaneous-move and sequential-move one, the reason is that the lowest product price and the largest market demand easily occurs in the cooperative game compared with the others, the upstream module manufacturer takes advantage of MP to increase the modularity level and decrease manufacturing cost for the whole supply chain, the downstream assembler task is to shorten the lead time according to customer's needs, while the wholesale price in cooperative game higher than simultaneous-move game and sequential-move game can ensure each firm's benefits, effectively prevent from the effect of double marginalization and obtain Pareto optimality.
引用
收藏
页码:1133 / 1153
页数:21
相关论文
共 50 条
  • [21] Robust parameter design of supply chain inventory policy considering the uncertainty of demand and lead time
    Tang, L. N.
    Ma, Y. Z.
    Wang, J. J.
    Ouyang, L. H.
    Byun, J. H.
    SCIENTIA IRANICA, 2019, 26 (05) : 2971 - 2987
  • [22] Return policy and supply chain coordination with network-externality effect
    Xu, Lei
    Li, Yongjian
    Govindan, Kannan
    Yue, Xiaohang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (10) : 3714 - 3732
  • [23] Optimal Return Policy in Direct Selling Supply Chain
    Wang Bei
    Zhao Chaihou
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON PRODUCT INNOVATION MANAGEMENT, VOLS I AND II, 2009, : 1447 - 1451
  • [24] Supply Chain Optimization System of Mass Customization Based on Multi-CODP
    Yu, Wang
    CCDC 2009: 21ST CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, PROCEEDINGS, 2009, : 3437 - 3442
  • [25] A Reverse Blending based supply chain for mass customization of green fertilizers
    Benhamou, Latifa
    Giard, Vincent
    Fenies, Pierre
    JOURNAL OF CLEANER PRODUCTION, 2023, 415
  • [26] A Knowledge-based Customization System for Supply Chain Integration
    Cheung, C. F.
    Cheung, C. M.
    Kwok, S. K.
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (04) : 3906 - 3924
  • [27] Influences of supply chain finance on the mass customization program: risk attitudes and cash flow shortage
    Guo, Shu
    Liu, Na
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2020, 27 (05) : 2396 - 2421
  • [28] Supply chain resource integration and optimization in mass customization by the fourth party logistics
    Yao, J.-M., 1600, Asian Network for Scientific Information (12): : 7729 - 7733
  • [29] Supply chain model with variable lead time under credit policy
    R. Uthayakumar
    M. Rameswari
    The International Journal of Advanced Manufacturing Technology, 2013, 64 : 389 - 397
  • [30] Supply chain model with variable lead time under credit policy
    Uthayakumar, R.
    Rameswari, M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 64 (1-4) : 389 - 397