Supply Constraint from Earthquakes in Japan in Input-Output Analysis

被引:9
|
作者
Yagi, Michiyuki [1 ]
Kagawa, Shigemi [2 ]
Managi, Shunsuke [3 ,4 ]
Fujii, Hidemichi [2 ]
Guan, Dabo [5 ]
机构
[1] Shinshu Univ, Fac Econ & Law, 3-1-1 Asahi, Matsumoto, Nagano 3908621, Japan
[2] Kyushu Univ, Fac Econ, Nishi Ku, 744 Motooka, Fukuoka 8190395, Japan
[3] Kyushu Univ, Urban Inst, Nishi Ku, 744 Motooka, Fukuoka 8190395, Japan
[4] Kyushu Univ, Dept Civil Engn, Nishi Ku, 744 Motooka, Fukuoka 8190395, Japan
[5] Tsinghua Univ, Dept Earth Syst Sci, Room S801,S803,S805 Mengminwei Sci & Technol Bldg, Beijing 100084, Peoples R China
关键词
Earthquakes in Japan; input-output analysis; supply constraint; GHOSH MODEL; PLAUSIBILITY; FOOTPRINT; CONSUMPTION; PRICE;
D O I
10.1111/risa.13525
中图分类号
R1 [预防医学、卫生学];
学科分类号
1004 ; 120402 ;
摘要
Disasters often cause exogenous flow damage (i.e., the [hypothetical] difference in economic scale with and without a disaster in a certain period) to production ("supply constraint"). However, input-output (IO) analysis (IOA) cannot usually consider it, because the Leontief quantity model (LQM) assumes that production is endogenous; the Ghosh quantity model (GQM) is considered implausible; and the Leontief price model (LPM) and the Ghosh price model (GPM) assume that quantity is fixed. This study proposes to consider a supply constraint in the LPM, introducing the price elasticity of demand. This study uses the loss of social surplus (SS) as a damage estimation because production (sales) is less informative as a damage index than profit (margin); that is, production can be any amount if without considering profit, and it does not tell exactly how much profit is lost for each supplier (upstream sector) and buyer (downstream sector). As a model application, this study examines Japan's largest five earthquakes from 1995 to 2017 and the Great East Japan Earthquake (GEJE) in March 2011. The worst earthquake at the peak tends to increase price by 10-20% and decrease SS by 20-30%, when compared with the initial month's prices/production. The worst damage tends to last eight months at most, accumulating 0.5-month-production damage (i.e., the sum of [hypothetical] differences in SS with and without an earthquake [for eight months] is 50% of the initial month production). Meanwhile, the GEJE in the five prefectures had cumulatively, a 25-month-production damage until the temporal recovery at the 37th month.
引用
收藏
页码:1811 / 1830
页数:20
相关论文
共 50 条
  • [11] A dynamic input-output model for nascent bioenergy supply chains
    Cruz, Jose B., Jr.
    Tan, Raymond R.
    Culaba, Alvin B.
    Ballacillo, Jo-Anne
    APPLIED ENERGY, 2009, 86 : S86 - S94
  • [12] Supply versus use designs of environmental extensions in input-output analysis: Conceptual and empirical implications for the case of energy
    Wieland, Hanspeter
    Giljum, Stefan
    Eisenmenger, Nina
    Wiedenhofer, Dominik
    Bruckner, Martin
    Schaffartzik, Anke
    Owen, Anne
    JOURNAL OF INDUSTRIAL ECOLOGY, 2020, 24 (03) : 548 - 563
  • [13] The economic evolution of the La Region de los Rios since its creation from an Input-Output analysis
    Miranda Castillo, Juan Carlos
    Ramos Carvajal, Carmen
    Reyes Irigoyen, Rene
    Acum Boassi, Felipe
    Vidal Vidal, Luis Hernan
    ESTUDIOS DE ECONOMIA APLICADA, 2019, 37 (01): : 170 - 190
  • [14] Structural carbon emissions from industry and energy systems in China: An input-output analysis
    Jiang, Tangyang
    Huang, Shoujun
    Yang, Jun
    JOURNAL OF CLEANER PRODUCTION, 2019, 240
  • [15] Recovery from the Great Depression in the U.S., Britain, Germany, and Japan: A Comparative Input-Output Analysis
    Yang, Donghyu
    Cho, Sunghun
    SEOUL JOURNAL OF ECONOMICS, 2015, 28 (03) : 359 - 375
  • [16] Waste treatment in physical input-output analysis
    Dietzenbacher, E
    ECOLOGICAL ECONOMICS, 2005, 55 (01) : 11 - 23
  • [17] CARBON FOOTPRINT AND INPUT-OUTPUT ANALYSIS - AN INTRODUCTION
    Wiedmann, Thomas
    ECONOMIC SYSTEMS RESEARCH, 2009, 21 (03) : 175 - 186
  • [18] Input-output analysis of the Chinese construction sector
    Wu, Xing
    Zhang, Zhihui
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (09) : 905 - 912
  • [19] Grey Input-output Analysis for Fixed Assets
    Li, Qiaoxing
    Liu, Sifeng
    JOURNAL OF GREY SYSTEM, 2017, 29 (02) : 14 - 28
  • [20] The Recovery of the Input-Output Analysis in the Czech Republic
    Sixta, Jaroslav
    STATISTIKA-STATISTICS AND ECONOMY JOURNAL, 2019, 99 (03) : 235 - 245