共 25 条
[1]
Abbasi M., 2012, SPE CAN UNC RES C, DOI [10.2118/162661-MS, DOI 10.2118/162661-MS]
[4]
BURDINE NT, 1953, T AM I MIN MET ENG, V198, P71
[6]
Corey A.T., 1954, Prod. Mon.
[8]
Estimating Effective Fracture Pore Volume From Flowback Data and Evaluating Its Relationship to Design Parameters of Multistage-Fracture Completion
[J].
SPE PRODUCTION & OPERATIONS,
2017, 32 (04)
:423-439
[9]
Fu Y, 2019, PROCEEDINGS OF 2019 8TH INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT (ICITM 2019), P1, DOI [10.1109/icitm.2019.8710724, 10.1109/icc.2019.8761754, 10.1109/ICITM.2019.8710724]