Novel continuous-time formulations for scheduling multi-stage multi-product batch plants with identical parallel units

被引:0
作者
Liu, Yu [1 ]
Karimi, I. A. [1 ]
机构
[1] Natl Univ Singapore, Dept Chem & Biomol Engn, Singapore 117576, Singapore
来源
16TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING AND 9TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING | 2006年 / 21卷
关键词
MILP; multi-product; batch plant; scheduling; makespan;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Scheduling production optimally in multi-stage multi-product plants is a very difficult problem that has received limited attention. While the case of non-identical parallel units has been addressed, the case of identical parallel units is equally worthy of attention, as many plants are or can be approximated as such. In this paper, we construct and compare several novel MILP formulations for the latter. In contrast to the existing work, we increase solution efficiency by considering each stage as a block of multiple identical units, thereby eliminating numerous binary variables for assigning batches to specific units. Interestingly, a novel formulation using an adjacent pair-wise sequencing approach proves superior to slot-based formulations.
引用
收藏
页码:1979 / 1984
页数:6
相关论文
共 50 条
[41]   Performance evaluation of linear and non-linear multi-product multi-stage lines with unreliable machines and finite homogeneous buffers [J].
Colledani, M. ;
Gandola, F. ;
Matta, A. ;
Tolio, T. .
IIE TRANSACTIONS, 2008, 40 (06) :612-626
[42]   A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants [J].
Sundaramoorthy, A ;
Karimi, IA .
CHEMICAL ENGINEERING SCIENCE, 2005, 60 (10) :2679-2702
[43]   Autonomous decentralized scheduling system for multi-stage parallel-unit production processes [J].
Kitajima, T ;
Nishitani, H ;
Saitoh, A ;
Hasebe, S ;
Hashimoto, I .
KAGAKU KOGAKU RONBUNSHU, 1996, 22 (05) :1031-1038
[44]   A multi-stage dynamic soft scheduling algorithm for the uncertain steelmaking-continuous casting scheduling problem [J].
Jiang, Sheng-long ;
Zheng, Zhong ;
Liu, Min .
APPLIED SOFT COMPUTING, 2017, 60 :722-736
[45]   Long-term scheduling of a single-unit multi-product continuous process to manufacture high performance glass [J].
Lima, Ricardo M. ;
Grossmann, Ignacio E. ;
Jiao, Yu .
COMPUTERS & CHEMICAL ENGINEERING, 2011, 35 (03) :554-574
[46]   Multi-stage man-machine cooperated scheduling method for steelmaking & continuous casting [J].
Zhao, Ning ;
Li, Liang ;
Du, Yan-Hua .
Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2014, 20 (07) :1675-1683
[47]   Real-time scheduling of multi-stage flexible job shop floor [J].
Ham, Myoungsoo ;
Lee, Young Hoon ;
Kim, Sun Hoon .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (12) :3715-3730
[48]   Quality risk prediction at a non-sampling station machine in a multi-product, multi-stage, parallel processing manufacturing system subjected to sequence disorder and multiple stream effects [J].
Anna Rotondo ;
Paul Young ;
John Geraghty .
Annals of Operations Research, 2013, 209 :255-277
[49]   Quality risk prediction at a non-sampling station machine in a multi-product, multi-stage, parallel processing manufacturing system subjected to sequence disorder and multiple stream effects [J].
Rotondo, Anna ;
Young, Paul ;
Geraghty, John .
ANNALS OF OPERATIONS RESEARCH, 2013, 209 (01) :255-277
[50]   A Continuous-Time Tightened Formulation for Single-Stage Batch Scheduling with Sequence-Dependent Changeovers [J].
Marchetti, Pablo A. ;
Cerda, Jaime .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2009, 48 (01) :483-498