共 50 条
- [38] A PTAS for the Multiple Parallel Identical Multi-stage Flow-Shops to Minimize the Makespan [J]. Frontiers in Algorithmics, FAW 2016, 2016, 9711 : 227 - 237
- [40] Scheduling of a pipeless multi-product batch plant using mixed-integer programming combined with heuristics [J]. European Symposium on Computer-Aided Process Engineering-15, 20A and 20B, 2005, 20a-20b : 1033 - 1038