Knowledge-based design for assembly in agile manufacturing by using Data Mining methods

被引:41
作者
Kretschmer, R. [2 ]
Pfouga, A. [1 ]
Rulhoff, S. [1 ]
Stjepandic, J. [1 ]
机构
[1] PROSTEP AG, Business Unit Prod Creat 3D, Dolivostr 11, D-64293 Darmstadt, Germany
[2] Miele & Cie KG, Segment Profess Laundry, Technol Lehrte, Ind Str 3, D-31275 Lehrte, Germany
关键词
Design for assembly; Agile manufacturing; Digital factory; Assembly; Process planning; Data mining; PRODUCT DESIGN;
D O I
10.1016/j.aei.2016.12.006
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Decision making in early production planning phases is typically based on a rough estimation due to lack of a comprehensive, reliable knowledge base. Virtual planning has been prevailed as a method used to evaluate risks and costs before the concrete realization of production processes. The process of product assembly, which yields a high share in total production costs, gets its particular importance. This paper introduces a new approach and its initial implementation for knowledge-based design for assembly in agile manufacturing by using data mining (DM) methods in the field of series production with high variance. The approach adopts the usage of bulk data with old, successful designs in order to extrapolate its scope for assembly processes. Especially linked product and process data allow the innovative usage of DM methods in order to facilitate the front loading in the product development. The concept presents an affordable assistance potential for development of new products variants along the product emergence process (PEP). With this approach an early cost estimation of assembly processes in series production can be conducted using advanced DM methods as shown in an industrial use case. Furthermore, design and planning processes can be supported effectively. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:285 / 299
页数:15
相关论文
共 72 条
  • [41] Knowledge-based vehicle body conceptual assembly design
    Li, Y-B
    Chen, G-L
    Lai, X-M
    Jin, S.
    Xing, Y-F
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART D-JOURNAL OF AUTOMOBILE ENGINEERING, 2008, 222 (D2) : 221 - 234
  • [42] Lotter B, 2013, MONTAGE IND PRODUKTI
  • [43] Magrab EdwardB., 2010, Integrated Product and Process Design and Development: The Product Realization Process
  • [44] McLay Allan, 2014, International Journal of Agile Systems and Management, V7, P101, DOI 10.1504/IJASM.2014.061430
  • [45] Namouz E.Z., 2013, Smart Prod. Eng, P777
  • [46] Nicholds Boyd A., 2014, International Journal of Agile Systems and Management, V7, P1, DOI 10.1504/IJASM.2014.059145
  • [47] Ohno-Machado L, 1998, J AM MED INFORM ASSN, P523
  • [48] Petzelt D., 2009, PRODUKTDATEN J, V16, P45
  • [49] Ponn J., 2011, KONZEPTENTWICKLUNG G, V2nd
  • [50] Adaptive planning and optimization of joining and assembling sequences using parallel acting working units
    Putz, M.
    Richter, A.
    Pfeifer, M.
    [J]. CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2010, 59 (01) : 57 - 60