The Netherlands schedules track maintenance to improve track workers' safety

被引:38
|
作者
van Zante-de Fokkert, J. I.
den Hertog, D.
van den Berg, F. J.
Verhoeven, J. H. M.
机构
[1] Ctr Quantitat Methods, NL-5600 AK Eindhoven, Netherlands
[2] Tilburg Univ, NL-5000 LE Tilburg, Netherlands
[3] ProRail Bedrijfsplanning, NL-3500 GA Utrecht, Netherlands
关键词
facilities-equipment planning : maintenance; replacement; government : services; RAILWAY;
D O I
10.1287/inte.1060.0246
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
After several fatal accidents, improving the safety of rail-track workers became a political priority in The Netherlands. Maintaining the track was one of the most dangerous jobs in the country. ProRail divides its infrastructure into working zones to be taken out of service during maintenance. We developed a two-step method of constructing a four-week maintenance schedule in which each working zone of the main lines is closed to trains at night exactly once. The alterations in trains' departure and arrival times are within the restrictions imposed by train operators. Workers have accepted the resulting schedule, which provides them with a manageable maximum workload per night. Such a schedule is unique in Europe. It has been in operation since 2000 and has clearly proven its benefits.
引用
收藏
页码:133 / 142
页数:10
相关论文
共 50 条
  • [1] PLANNING OF MECHANIZED TRACK MAINTENANCE BY THE NETHERLANDS RAILWAYS, BASED ON TRACK RECORDING CAR DATA.
    Esveld, Coenraad
    Groenhuysen, Frans
    Rail International, 1980, 11 (05): : 282 - 294
  • [2] Development of training system of human factors skills for occupational safety of track maintenance workers
    Sato, Y
    Kusukami, K
    INTERNATIONAL JOURNAL OF PSYCHOLOGY, 2004, 39 (5-6) : 197 - 197
  • [3] Optimal working zone division for safe track maintenance in The Netherlands
    den Hertog, D
    van Zante-de Fokkert, JI
    Sjamaar, SA
    Beusmans, R
    ACCIDENT ANALYSIS AND PREVENTION, 2005, 37 (05): : 890 - 893
  • [4] TRACK MAINTENANCE
    PEASE, AIB
    HUTBROWN, DH
    COYSTEN, P
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1986, 80 : 307 - 310
  • [5] Track safety audit and maintenance planning pay off
    不详
    POWER ENGINEERING, 2005, 109 (05) : 72 - 74
  • [6] Vocational Skills Comprehensive Evaluation Method of Track Maintenance Workers
    Jia, Dongyao
    Zou, Shengxiong
    PROCEEDINGS OF THE 2013 INTERNATIONAL CONFERENCE ON ELECTRICAL AND INFORMATION TECHNOLOGIES FOR RAIL TRANSPORTATION (EITRT2013), VOL II, 2014, 288 : 487 - 495
  • [7] Track Maintenance Reactions for Combined Track Defects
    Wu, Qing
    Cole, Colin
    Spiryagin, Maksym
    ICRT 2021: PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON RAIL TRANSPORTATION, 2022, : 9 - 15
  • [8] TRACK MAINTENANCE.
    Huart, Fernand Henri
    Champvillard, Daniel
    French Railway Review, 1983, 1 (04): : 347 - 349
  • [9] TRACK STRESSES AND LAYING THE BODY OF THE TRACK FOR RAIL OPERATIONS AND MECHANIZED TRACK MAINTENANCE.
    Hielen, Georg
    Hoppstaedter, Wolfgang
    Glueckauf & Translation, 1985, 121 (12): : 279 - 281
  • [10] Interferometric radar principles in track hazard detection to improve safety
    Waite, JL
    Arnold, DV
    IGARSS 2000: IEEE 2000 INTERNATIONAL GEOSCIENCE AND REMOTE SENSING SYMPOSIUM, VOL I - VI, PROCEEDINGS, 2000, : 2507 - 2509