Assessing and Prioritising Delay Factors of Prefabricated Concrete Building Projects in China

被引:47
|
作者
Ji, Yingbo [1 ]
Qi, Lin [1 ]
Liu, Yan [1 ]
Liu, Xinnan [1 ]
Li, Hong Xian [2 ]
Li, Yan [2 ]
机构
[1] North China Univ Technol, Dept Civil Engn, Beijing 100043, Peoples R China
[2] Deakin Univ, Sch Architecture & Built Environm, Geelong, Vic 3220, Australia
来源
APPLIED SCIENCES-BASEL | 2018年 / 8卷 / 11期
基金
国家重点研发计划;
关键词
construction delay; prefabricated construction; decision-making trial and evaluation laboratory (DEMATEL); analytic network process (ANP); multi-criteria decision making; ROAD CONSTRUCTION PROJECTS; HIERARCHY PROCESS AHP; SCHEDULE RISK; HONG-KONG; MANAGEMENT; COST; DEMATEL; PERSPECTIVE; OPPORTUNITY; SIMULATION;
D O I
10.3390/app8112324
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Prefabricated construction has been widely accepted as an alternative to conventional cast-in-situ construction, given its improved performance. However, prefabricated concrete building projects frequently encounter significant delays. It is, therefore, crucial to identify key factors affecting schedule and explore strategies to minimise the schedule delays for prefabricated concrete building projects. This paper adopts the decision-making trial and evaluation laboratory (DEMATEL) model and analytic network process (ANP) method to quantify the cause-and-effect relationships and prioritise the key delay factors in terms of their importance in the Chinese construction industry. The DEMATEL model evaluates the extent to which each factor impacts other factors. The quantified extents are then converted into a prioritisation matrix through ANP. The delay factors of prefabricated construction projects are selected and categorised based on a literature review and an expert interview. Questionnaires are then implemented to collect the data. The results reveal that the issue of inefficient structural connections for prefabricated components is found to be the most significant factor and most easily affected by other delay factors. This research also suggests prioritising major delay factors, such as lack of communication among participants' and low productivity', in the Chinese construction industry during scheduling control. Overall, this research contributes an assessment framework for decision making in the scheduling management of prefabricated construction.
引用
收藏
页数:16
相关论文
共 50 条
  • [1] Critical Factors Influencing Interface Management of Prefabricated Building Projects: Evidence from China
    Zhang, Shengxi
    Li, Zhongfu
    Ma, Shengbin
    Li, Long
    Yuan, Mengqi
    SUSTAINABILITY, 2022, 14 (09)
  • [2] RESEARCH ON INVESTMENT RISK INFLUENCE FACTORS OF PREFABRICATED BUILDING PROJECTS
    Li, Xiao-Juan
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2020, 26 (07) : 599 - 613
  • [3] Influence of BIM and Lean on mitigating delay factors in building projects
    Perez, Yeimi
    Avila, Jeffer
    Sanchez, Omar
    RESULTS IN ENGINEERING, 2024, 22
  • [4] The significant factors causing delay of building construction projects in Malaysia
    Alaghbari, Wa'el
    Kadir, Mohd. Razali A.
    Salim, Azizah
    Ernawati
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (02) : 192 - +
  • [5] A BIM-Based Study on the Comprehensive Benefit Analysis for Prefabricated Building Projects in China
    Ji, Yingbo
    Chang, Siwei
    Qi, Yuan
    Li, Yan
    Li, Hong Xian
    Qi, Kai
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [6] Factors influencing transaction costs of prefabricated housing projects in China: developers' perspective
    Wu, Hongjuan
    Qian, Queena K.
    Straub, Ad
    Visscher, Henk J.
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (01) : 476 - 501
  • [7] Prioritising Project Scope Definition Elements in Public Building Projects
    Fageha, Mohammed K.
    Aibinu, Ajibade A.
    CONSTRUCTION ECONOMICS AND BUILDING, 2014, 14 (03): : 18 - 33
  • [8] Delay Factors: A Comparative Analysis between Road Infrastructure and Building Projects
    Sanchez, Omar
    Castaneda, Karen
    Mejia, Guillermo
    Pellicer, Eugenio
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 223 - 231
  • [9] Assessing Delay Factors and Mitigation Measures in Building Maintenance Works
    Yasin, Mohd Norazam
    Razman, Ruzaimah
    Nagapan, Sasitharan
    Moayedi, Farzaneh
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2023, 14 (03): : 129 - 136
  • [10] Critical factors influencing carbon emissions of prefabricated building supply chains in China
    Du, Qiang
    Pang, Qiaoyu
    Bao, Tana
    Guo, Xiqian
    Deng, Yunge
    JOURNAL OF CLEANER PRODUCTION, 2021, 280