MATHEMATICAL MODELS OF THE STUDENT SYNDROME FOR USE IN PROJECT MANAGEMENT

被引:0
作者
Kucera, Petr [1 ]
Bartoska, Jan [1 ]
Subrt, Tomas [1 ]
机构
[1] Czech Univ Life Sci Prague, Fac Econ & Management, Dept Syst Engn, Kanycka 29, Prague 16521 6, Suchdol, Czech Republic
来源
PROCEEDINGS OF THE INTERNATIONAL CONFERENCE QUANTITATIVE METHODS IN ECONOMICS MULTIPLE CRITERIA DECISION MAKING XVII | 2014年
关键词
Project management; Student Syndrome; Parkinson's law; mathematical model; work effort; resource stimulation; TIME;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
The paper deals with the "Student Syndrome" phenomenon and its expression using different mathematical models. Every existing activity in any project is, to a higher or lower extent, determined by the effect of the human agent, which commonly takes the Student's syndrome form. The inefficiency of a number of projects in practice is largely caused by an unsuccessful realization of partial activities. The effect of the human agent is in this respect fundamental. The human agent, as an allocated resource in the activity, is liable to a number of non-specified impacts and stimuli, and as such s/he is rather versatile in his/her behaviour. The versatility of the human agent in projects can be described by the "Student Syndrome" phenomenon. If the "Student Syndrome" phenomenon could be completely expressed by means of a mathematical model, it would be possible to improve the prediction of its impact on project activities, and therefore to exploit the resources allocated in the project more efficiently and prevent project crises. We can not expect that the "Student Syndrome" phenomenon can be expressed in a trivial way and using only one mathematical function. This paper proposes several functions for this representation. The proposed functions are compared in terms of their course and the possibility of work schedule resources parameterization. We can regard this original viewpoint as suggestive for the area of human resources management in projects. The article brings the quantification of qualitative features of the human agent in project management.
引用
收藏
页码:128 / 133
页数:6
相关论文
共 17 条
[11]  
Lechler T.G., 2005, Engineering Management Journal, V17, P45, DOI DOI 10.1080/10429247.2005.11431672
[12]   Uncertainty modelling in software development projects (with case study) [J].
Özdamar, L ;
Alanya, E .
ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) :157-178
[13]  
Parkinson C.N., 1991, PARKINSONS LAW OTHER
[14]   An approximation of the activity duration distribution in PERT [J].
Premachandra, IM .
COMPUTERS & OPERATIONS RESEARCH, 2001, 28 (05) :443-452
[15]  
Rand G.K., 2000, International Journal of Project Management, V18, P173, DOI DOI 10.1016/S0263-7863(99)00019-8
[16]  
Tadepalli S., 2009, 2009 ASEE ANN C EXP
[17]   Reflecting activities in product developing teams:: conditions for improved project management processes [J].
Zika-Viktorsson, Annika ;
Ingelgard, Anders .
RESEARCH IN ENGINEERING DESIGN, 2006, 17 (02) :103-111