An improved artificial bee colony algorithm for addressing distributed flow shop with distance coefficient in a prefabricated system

被引:106
作者
Li, Jun-qing [1 ,2 ]
Bai, Shun-Chang [3 ]
Duan, Pei-yong [2 ]
Sang, Hong-yan [1 ]
Han, Yu-yan [1 ]
Zheng, Zhi-xin [1 ]
机构
[1] Liaocheng Univ, Sch Comp Sci, Liaocheng, Shandong, Peoples R China
[2] Shandong Normal Univ, Sch Informat & Engn, Jinan, Shandong, Peoples R China
[3] Cornell Univ, Dept Comp & Informat Sci, Ithaca, NY USA
基金
中国国家自然科学基金;
关键词
prefabricated production; flow shop; distributed scheduling; artificial bee colony algorithm; distance coefficient; SCHEDULING PROBLEM; OPTIMIZATION ALGORITHM; NEIGHBORHOOD SEARCH; MAKESPAN; MODEL; TRANSPORTATION; CONSTRUCTION; INTELLIGENCE;
D O I
10.1080/00207543.2019.1571687
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes an improved artificial bee colony (IABC) algorithm for addressing the distributed flow shop considering the distance coefficient found in precast concrete production system, with the minimisation of the makespan. In the proposed algorithm, each solution is first represented by a two-dimensional vector, where the first dimensional vector is the factory and the second dimensional vector lists the operation scheduling sequence of each factory. Second, considering the distributed problem feature, a distributed iterated greedy heuristic (DIG) is developed where destruction and construction processes are designed in detail while considering the distributed structures. Third, an efficient population initialisation method that considers the factory workload balance is presented. Then, a local search approach that randomly replaces two factories with two randomly selected jobs and that finds an optimal position for the two inserted operations via the DIG method is proposed. For the canonical ABC algorithm, using the DIG approach, the main three parts are improved, namely, the employee, onlooker, and scout bees. Finally, the proposed algorithm is tested on sets of extended instances based on the well-known benchmarks. Through an analysis of the experimental results, the highly effective proposed IABC algorithm is compared to several efficient algorithms drawn from the literature.
引用
收藏
页码:6922 / 6942
页数:21
相关论文
共 60 条
[1]   A multi-objective GA-based optimisation for holistic Manufacturing, transportation and Assembly of precast construction [J].
Anvari, B. ;
Angeloudis, P. ;
Ochieng, W. Y. .
AUTOMATION IN CONSTRUCTION, 2016, 71 :226-241
[2]   Off-site construction optimization: Sequencing multiple job classes with time constraints [J].
Arashpour, Mehrdad ;
Wakefield, Ron ;
Abbasi, Babak ;
Lee, E. W. M. ;
Minas, James .
AUTOMATION IN CONSTRUCTION, 2016, 71 :262-270
[3]   Multi-objective artificial bee algorithm based on decomposition by PBI method [J].
Bai, Jing ;
Liu, Hong .
APPLIED INTELLIGENCE, 2016, 45 (04) :976-991
[4]   A novel chemical reaction optimization for the distributed permutation flowshop scheduling problem with makespan criterion [J].
Bargaoui, Hafewa ;
Driss, Olfa Belkahla ;
Ghedira, Khaled .
COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 111 :239-250
[5]  
Benjaoran V., 2003, P 11 ANN C INT GROUP
[6]   Flowshop scheduling model for bespoke precast concrete production planning [J].
Benjaoran, Vacharapoom ;
Dawood, Nashwan ;
Hobbs, Brian .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (01) :93-105
[7]   Intelligence approach to production planning system for bespoke precast concrete products [J].
Benjaoran, Vacharapoom ;
Dawood, Nashwan .
AUTOMATION IN CONSTRUCTION, 2006, 15 (06) :737-745
[8]   Production scheduling for precast plants using a flow shop sequencing model [J].
Chan, WT ;
Hu, H .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2002, 16 (03) :165-174
[9]   Optimal facility layout planning for AGV-based modular prefabricated manufacturing system [J].
Chen, Chen ;
Duc Tran Huy ;
Tiong, Lee Kong ;
Chen, I-Ming ;
Cai, Yiyu .
AUTOMATION IN CONSTRUCTION, 2019, 98 :310-321
[10]   Process reengineering and improvement for building precast production [J].
Chen, Jieh-Haur ;
Yang, Li-Ren ;
Tai, Hsing-Wei .
AUTOMATION IN CONSTRUCTION, 2016, 68 :249-258