Prioritisation Assessment and Robust Predictive System for Medical Equipment: A Comprehensive Strategic Maintenance Management

被引:13
|
作者
Zamzam, Aizat Hilmi [1 ,2 ]
Al-Ani, Ayman Khallel Ibrahim [1 ]
Wahab, Ahmad Khairi Abdul [1 ]
Lai, Khin Wee [1 ]
Satapathy, Suresh Chandra [3 ]
Khalil, Azira [4 ]
Azizan, Muhammad Mokhzaini [5 ]
Hasikin, Khairunnisa [1 ]
机构
[1] Univ Malaya, Fac Engn, Dept Biomed Engn, Kuala Lumpur, Malaysia
[2] Minist Hlth Malaysia, Engn Serv Dept, Putrajaya, Malaysia
[3] Deemed Be Univ, Kalinga Inst Ind Technol, Sch Comp Engn, Bhubaneswar, India
[4] Univ Sains Islam Malaysia, Fac Sci & Technol, Nilai, Negeri Sembilan, Malaysia
[5] Univ Sains Islam Malaysia, Fac Engn & Built Environm, Dept Elect & Elect Engn, Nilai, Negeri Sembilan, Malaysia
关键词
medical devices; biomedical equipment; machine learning; prioritisation; prediction; MACHINE LEARNING ALGORITHMS; DECISION-MAKING SUPPORT; BIG DATA; RISK; COVID-19; DEVICES; IMPACT; MODEL;
D O I
10.3389/fpubh.2021.782203
中图分类号
R1 [预防医学、卫生学];
学科分类号
1004 ; 120402 ;
摘要
The advancement of technology in medical equipment has significantly improved healthcare services. However, failures in upkeeping reliability, availability, and safety affect the healthcare services quality and significant impact can be observed in operations' expenses. The effective and comprehensive medical equipment assessment and monitoring throughout the maintenance phase of the asset life cycle can enhance the equipment reliability, availability, and safety. The study aims to develop the prioritisation assessment and predictive systems that measure the priority of medical equipment's preventive maintenance, corrective maintenance, and replacement programmes. The proposed predictive model is constructed by analysing features of 13,352 medical equipment used in public healthcare clinics in Malaysia. The proposed system comprises three stages: prioritisation analysis, model training, and predictive model development. In this study, we proposed 16 combinations of novel features to be used for prioritisation assessment and prediction of preventive maintenance, corrective maintenance, and replacement programme. The modified k-Means algorithm is proposed during the prioritisation analysis to automatically distinguish raw data into three main clusters of prioritisation assessment. Subsequently, these clusters are fed into and tested with six machine learning algorithms for the predictive prioritisation system. The best predictive models for medical equipment's preventive maintenance, corrective maintenance, and replacement programmes are selected among the tested machine learning algorithms. Findings indicate that the Support Vector Machine performs the best in preventive maintenance and replacement programme prioritisation predictive systems with the highest accuracy of 99.42 and 99.80%, respectively. Meanwhile, K-Nearest Neighbour yielded the highest accuracy in corrective maintenance prioritisation predictive systems with 98.93%. Based on the promising results, clinical engineers and healthcare providers can widely adopt the proposed prioritisation assessment and predictive systems in managing expenses, reporting, scheduling, materials, and workforce.
引用
收藏
页数:19
相关论文
共 50 条
  • [31] Micro-process based management of medical equipment maintenance
    Bassani, JWM
    Rocha, LS
    Lüders, ML
    Bizinotto, WJ
    SECOND JOINT EMBS-BMES CONFERENCE 2002, VOLS 1-3, CONFERENCE PROCEEDINGS: BIOENGINEERING - INTEGRATIVE METHODOLOGIES, NEW TECHNOLOGIES, 2002, : 1942 - 1943
  • [32] Expert system for mine concentrator equipment maintenance management
    Guo, N
    Huang, P
    Wu, L
    Lu, X
    COMPUTER-AIDED PRODUCTION ENGINEERING, 2001, : 155 - 158
  • [33] MANAGEMENT-SYSTEM MAKES MAINTENANCE A STRATEGIC INVESTMENT
    不详
    INDUSTRIAL ENGINEERING, 1991, 23 (07): : 70 - 70
  • [34] UTAH COPPER KEEPING EQUIPMENT ON LINE AND AVAILABLE - HOW STRATEGIC UPGRADING OF EQUIPMENT WAS MERGED WITH A COMPREHENSIVE MINE MAINTENANCE PROGRAM
    JACKSON, D
    E&MJ-ENGINEERING AND MINING JOURNAL, 1980, 181 (09): : 70 - 75
  • [35] Design of Vehicle Equipment's Maintenance and Management System
    Ye, Chunqing
    PROCEEDINGS OF THE 2010 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND SCIENTIFIC MANAGEMENT, VOLS 1-2, 2010, : 426 - 429
  • [36] Equipment maintenance management system oriented to customer service
    Institute of Contemporary Manufacturing Engineering, Zhejiang University, Hangzhou 310027, China
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2007, 13 (07): : 1437 - 1443
  • [37] An Intelligent System Supporting a Maintenance Process of Specialised Medical Equipment
    Antosz, Katarzyna
    Stadnicka, Dorota
    INTELLIGENT SYSTEMS IN PRODUCTION ENGINEERING AND MAINTENANCE (ISPEM 2017), 2018, 637 : 23 - 32
  • [38] An integrated software system for medical equipment management
    Bliznakov, Z
    Pallikarakis, N
    PROCEEDINGS OF THE 23RD ANNUAL INTERNATIONAL CONFERENCE OF THE IEEE ENGINEERING IN MEDICINE AND BIOLOGY SOCIETY, VOLS 1-4: BUILDING NEW BRIDGES AT THE FRONTIERS OF ENGINEERING AND MEDICINE, 2001, 23 : 3598 - 3601
  • [39] Equipment Sub-system Extraction and Its Application in Predictive Maintenance
    Zhao, Pushe
    Kurihara, Masaru
    Noda, Tojiro
    Kashiwa, Hiroki
    Hiyama, Masaki
    Suzuki, Tadashi
    2018 IEEE INTERNATIONAL CONFERENCE ON PROGNOSTICS AND HEALTH MANAGEMENT (ICPHM), 2018,
  • [40] Application of Internet of Things Technology on Predictive Maintenance System of Coal Equipment
    Li Dong
    Ren Mingyue
    Meng Guoying
    13TH GLOBAL CONGRESS ON MANUFACTURING AND MANAGEMENT, 2017, 174 : 885 - 889