Prioritisation Assessment and Robust Predictive System for Medical Equipment: A Comprehensive Strategic Maintenance Management

被引:13
|
作者
Zamzam, Aizat Hilmi [1 ,2 ]
Al-Ani, Ayman Khallel Ibrahim [1 ]
Wahab, Ahmad Khairi Abdul [1 ]
Lai, Khin Wee [1 ]
Satapathy, Suresh Chandra [3 ]
Khalil, Azira [4 ]
Azizan, Muhammad Mokhzaini [5 ]
Hasikin, Khairunnisa [1 ]
机构
[1] Univ Malaya, Fac Engn, Dept Biomed Engn, Kuala Lumpur, Malaysia
[2] Minist Hlth Malaysia, Engn Serv Dept, Putrajaya, Malaysia
[3] Deemed Be Univ, Kalinga Inst Ind Technol, Sch Comp Engn, Bhubaneswar, India
[4] Univ Sains Islam Malaysia, Fac Sci & Technol, Nilai, Negeri Sembilan, Malaysia
[5] Univ Sains Islam Malaysia, Fac Engn & Built Environm, Dept Elect & Elect Engn, Nilai, Negeri Sembilan, Malaysia
关键词
medical devices; biomedical equipment; machine learning; prioritisation; prediction; MACHINE LEARNING ALGORITHMS; DECISION-MAKING SUPPORT; BIG DATA; RISK; COVID-19; DEVICES; IMPACT; MODEL;
D O I
10.3389/fpubh.2021.782203
中图分类号
R1 [预防医学、卫生学];
学科分类号
1004 ; 120402 ;
摘要
The advancement of technology in medical equipment has significantly improved healthcare services. However, failures in upkeeping reliability, availability, and safety affect the healthcare services quality and significant impact can be observed in operations' expenses. The effective and comprehensive medical equipment assessment and monitoring throughout the maintenance phase of the asset life cycle can enhance the equipment reliability, availability, and safety. The study aims to develop the prioritisation assessment and predictive systems that measure the priority of medical equipment's preventive maintenance, corrective maintenance, and replacement programmes. The proposed predictive model is constructed by analysing features of 13,352 medical equipment used in public healthcare clinics in Malaysia. The proposed system comprises three stages: prioritisation analysis, model training, and predictive model development. In this study, we proposed 16 combinations of novel features to be used for prioritisation assessment and prediction of preventive maintenance, corrective maintenance, and replacement programme. The modified k-Means algorithm is proposed during the prioritisation analysis to automatically distinguish raw data into three main clusters of prioritisation assessment. Subsequently, these clusters are fed into and tested with six machine learning algorithms for the predictive prioritisation system. The best predictive models for medical equipment's preventive maintenance, corrective maintenance, and replacement programmes are selected among the tested machine learning algorithms. Findings indicate that the Support Vector Machine performs the best in preventive maintenance and replacement programme prioritisation predictive systems with the highest accuracy of 99.42 and 99.80%, respectively. Meanwhile, K-Nearest Neighbour yielded the highest accuracy in corrective maintenance prioritisation predictive systems with 98.93%. Based on the promising results, clinical engineers and healthcare providers can widely adopt the proposed prioritisation assessment and predictive systems in managing expenses, reporting, scheduling, materials, and workforce.
引用
收藏
页数:19
相关论文
共 50 条
  • [1] IoT Based Predictive Maintenance Management of Medical Equipment
    Shamayleh, Abdulrahim
    Awad, Mahmoud
    Farhat, Jumana
    JOURNAL OF MEDICAL SYSTEMS, 2020, 44 (04)
  • [2] IoT Based Predictive Maintenance Management of Medical Equipment
    Abdulrahim Shamayleh
    Mahmoud Awad
    Jumana Farhat
    Journal of Medical Systems, 2020, 44
  • [3] DEVELOPMENT OF EQUIPMENT INTEGRITY MANAGEMENT SYSTEM BASED ON PREDICTIVE MAINTENANCE
    Jia, Guodong
    Wang, Hui
    Li, Xiang
    Zhong, Jiandong
    Xie, Guoshan
    Wang, Weihua
    PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE - 2013, VOL 1B: CODES AND STANDARDS, 2014,
  • [4] Integrated failure analysis using machine learning predictive system for smart management of medical equipment maintenance
    Zamzam, Aizat Hilmi
    Hasikin, Khairunnisa
    Wahab, Ahmad Khairi Abdul
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2023, 125
  • [5] Design and Development of a Computerized Maintenance Management System for Medical Equipment
    Vitale, Alejandro
    Antunez, Sergio
    ADVANCES IN BIOENGINEERING AND CLINICAL ENGINEERING, VOL 2, SABI 2023, 2024, 114 : 171 - 178
  • [6] Electrical equipment predictive maintenance system
    不详
    HYDROCARBON PROCESSING, 2003, 82 (01): : 27 - 27
  • [7] Cost management of medical equipment maintenance
    Rocha, LS
    Bassani, JWM
    PROCEEDINGS OF THE 26TH ANNUAL INTERNATIONAL CONFERENCE OF THE IEEE ENGINEERING IN MEDICINE AND BIOLOGY SOCIETY, VOLS 1-7, 2004, 26 : 3508 - 3511
  • [8] Web-based Maintenance Information System in Medical Equipment Management
    Fuaddi, Mahrul
    Sabarguna, Boy Subirosa
    3RD BIOMEDICAL ENGINEERING'S RECENT PROGRESS IN BIOMATERIALS, DRUGS DEVELOPMENT, AND MEDICAL DEVICES, 2019, 2092
  • [9] Comprehensive Framework for Preventive Maintenance Priority of Medical Equipment
    Saleh, Neven
    Balestra, Gabriella
    2015 37TH ANNUAL INTERNATIONAL CONFERENCE OF THE IEEE ENGINEERING IN MEDICINE AND BIOLOGY SOCIETY (EMBC), 2015, : 1227 - 1230
  • [10] Assessment of medical equipment maintenance management: proposed checklist using Iranian experience
    Morteza Arab-Zozani
    Ali Imani
    Leila Doshmangir
    Koustuv Dalal
    Rona Bahreini
    BioMedical Engineering OnLine, 20