A novel model for risk management of outsourced construction projects using decision-making methods: a case study

被引:24
作者
Mahmoudi, Amin [1 ]
Abbasi, Mehdi [2 ]
Deng, Xiaopeng [1 ]
Ikram, Muhammad [3 ]
Yeganeh, Salman [2 ]
机构
[1] Southeast Univ, Sch Civil Engn, Dept Construct & Real Estate, Nanjing, Peoples R China
[2] Islamic Azad Univ, Shiraz Branch, Dept Ind Engn, Shiraz, Iran
[3] Shenzhen Univ, Res Inst Business Analyt & Supply Chain Managemen, Coll Management, Shenzhen, Peoples R China
基金
中国国家自然科学基金;
关键词
GRA; BWM; Risk management; Construction projects; Project management; Decision making; SUPPLIER SELECTION; SERVICE QUALITY; GREY; COST; COMBINATION; PERFORMANCE; STRATEGIES; VIKOR; TIME;
D O I
10.1108/GS-09-2019-0038
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
Purpose Selecting a suitable contract to outsource construction projects is an ongoing concern for project managers and organizational directors. This study aims to propose a comprehensive model to manage the risks of outsourced construction project contracts. Design/methodology/approach To employ the proposed model, firstly, the types of contracts and risks in the organization should be identified, then, to prioritize the contracts, the identified risks are considered as criteria. After receiving the experts' opinions, the best-worst method (BWM) integrated with grey relation analysis (GRA) method was used to prioritize the contracts. BWM and GRA are multi-criteria decision-making methods with different approaches and applications. In the current study, BWM has been employed to calculate the weights of criteria because it has better performance than other methods such as the analytic hierarchy process (AHP). After calculating the weights of criteria, the GRA method has been utilized for ranking the alternatives. Findings According to the results obtained from the case study, the cost plus award fee contract is the most suitable alternative for outsourcing construction projects. The proposed methodology can be practically applied through different types of the projects such as construction or "engineering, procurement and construction". Originality/value To the best of our knowledge, this is the first time a conceptual model has been proposed to select an appropriate contract for construction projects. Also, for the first time, the BWM integrated with GRA method has been used to prioritize project contracts based on the potential risks. The proposed model can contribute to project managers for selecting a suitable contract with the least risk in construction projects.
引用
收藏
页码:97 / 123
页数:27
相关论文
共 53 条
[1]  
[Anonymous], TOP 10 RISKS OFFSHOR
[2]  
[Anonymous], 2013, GUIDE PROJECT MANAGE, V5
[3]  
Aubert B.A., 2005, The DATA BASE for Advances in Information Systems, V36, P9
[4]   IMPLICIT CONTRACTS AND FIXED PRICE EQUILIBRIA [J].
AZARIADIS, C ;
STIGLITZ, JE .
QUARTERLY JOURNAL OF ECONOMICS, 1983, 98 :1-22
[5]   The information technology outsourcing risk: a transaction cost and agency theory-based perspective [J].
Bahli, B ;
Rivard, S .
JOURNAL OF INFORMATION TECHNOLOGY, 2003, 18 (03) :211-221
[6]   SNOWBALL SAMPLING - PROBLEMS AND TECHNIQUES OF CHAIN REFERRAL SAMPLING [J].
BIERNACKI, P ;
WALDORF, D .
SOCIOLOGICAL METHODS & RESEARCH, 1981, 10 (02) :141-163
[7]   TO OUTSOURCE OR NOT [J].
BUCKLEW, M .
INTERNATIONAL JOURNAL OF INFORMATION MANAGEMENT, 1992, 12 (01) :3-20
[8]  
Corbett C.J., 1999, DESIGNING SUPPLY CON, P269
[9]  
Deng Julong, 1989, Journal of Grey Systems, V1, P1
[10]   The effects of global outsourcing strategies on participants' attitudes and organizational effectiveness [J].
Elmuti, D ;
Kathawala, Y .
INTERNATIONAL JOURNAL OF MANPOWER, 2000, 21 (1-2) :112-128