Optimal planning of Cross-regional hydrogen energy storage systems considering the uncertainty

被引:23
|
作者
Qiu, Yibin [1 ]
Li, Qi [1 ]
Wang, Tianhong [1 ]
Yin, Liangzhen [1 ]
Chen, Weirong [1 ]
Liu, Hong [2 ]
机构
[1] Southwest Jiaotong Univ, Sch Elect Engn, Chengdu 610031, Sichuan, Peoples R China
[2] Chinese Acad Macroecon Res, Energy Res Inst, Beijing 100038, Peoples R China
基金
中国国家自然科学基金;
关键词
Hydrogen; Optimal Planning; Cross-regional; Uncertainty; DISTRIBUTION NETWORKS; OPTIMIZATION; ALGORITHM; POWER;
D O I
10.1016/j.apenergy.2022.119973
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The cross-regional consumption of renewable energy can effectively solve the problem of the uneven spatial distribution of renewable energy. To explore the application of hydrogen energy storage systems (HESS) for cross-regional consumption of renewable energy, optimal planning of cross-regional HESS considering the un-certainty is researched in this study. Firstly, a two-layer planning model is proposed to consider investment and operation costs. The upper layer of the model aims to determine a feasible planning strategy for HESS based on existing conditions. The purpose of the lower layer is then to determine the optimal scheduling strategy and minimum operating cost of the system considering uncertainty based on distributionally robust optimization. Furthermore, the solution method that combines the modified Backtracking Search Algorithm (MBSA) and Yalmip/Cplex is utilized to determine the optimal placement and sizing of the HESS. Finally, the simulation experiment is performed with the case of Southwest China to verify the effectiveness of the proposed planning model and corresponding solution method. The simulation results show that the MBSA has a better convergence speed and stronger global search capability performance than the traditional BSA. MBSA converges at 44th, which is quicker than the 60th of BSA; the optimal objective value obtained by MBSA is $1,038,929,953.66, which is better than that of BSA of $1,051,512,303.18. In addition, the resulting HESS planning scheme can effectively reduce the network loss of the system, reduce the peak-to-valley load difference, and improve renewable energy consumption. Specifically, the system network loss is reduced from 1.56 MWh to 1.47 MWh, the peak-to-valley difference is reduced from 245.61 MW to 225.88 WM, and the total renewable energy con-sumption of four typical days is increased from 6582.07 MW to 7626.03 MW.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] Distributed optimal scheduling of regional integrated energy systems considering uncertainty and building heat storage
    Zhou Y.
    Ge J.
    Cheng E.
    Zang H.
    Sun G.
    Chen S.
    Wei Z.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2023, 43 (11): : 26 - 33
  • [2] Optimal allocation of energy storage systems considering wind power uncertainty
    Jani, Vahid
    Abdi, Hamdi
    JOURNAL OF ENERGY STORAGE, 2018, 20 : 244 - 253
  • [3] Optimal expansion planning of electrical energy distribution substation considering hydrogen storage
    Basaran, Kivanc
    Ozturk, Huseyin
    INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2024, 75 : 450 - 465
  • [4] Optimal planning of energy storage power station considering source-charge uncertainty
    Meng Q.
    Li X.
    Yu H.
    Li X.
    Li P.
    Jiang X.
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2021, 42 (10): : 415 - 423
  • [5] Optimal Planning of Energy Storage in Wind Integrated Systems considering Frequency Stability
    Bera, Atri
    Chalamala, Babu
    Byrne, Raymond H.
    Mitra, Joydeep
    2021 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2021,
  • [6] Cross-regional Day-ahead to Intra-day Scheduling Model Considering Forecasting Uncertainty of Renewable Energy
    Wang H.
    Qin H.
    Zhou C.
    Li F.
    Xu X.
    Pan X.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2019, 43 (19): : 60 - 67
  • [7] Optimal Sizing and Operation Strategy for Hybrid Energy Storage Systems Considering Wind Uncertainty
    Jiang, Tao
    Chen, Houhe
    Li, Xue
    Zhang, Rufeng
    Kou, Xiao
    Li, Fangxing
    2018 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2018,
  • [8] Optimal capacity planning of an integrated energy system considering uncertainty
    Cheng S.
    Xu J.
    He C.
    Zhang R.
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2021, 49 (18): : 17 - 24
  • [9] Optimal Planning of Hybrid Electricity-Hydrogen Energy Storage System Considering Demand Response
    Lu, Zijing
    Li, Zishou
    Guo, Xiangguo
    Yang, Bo
    PROCESSES, 2023, 11 (03)
  • [10] Research on the optimal planning method of hydrogen-storage units in wind-hydrogen energy system considering hydrogen energy source
    Dong, Yannan
    Han, Zijiao
    Li, Chong
    Ma, Shaohua
    Ma, Zhuo
    ENERGY REPORTS, 2023, 9 : 1258 - 1264