Cellular Bucket Brigades

被引:31
作者
Lim, Yun Fong [1 ]
机构
[1] Singapore Management Univ, Lee Kong Chian Sch Business, Singapore 178899, Singapore
关键词
WORK;
D O I
10.1287/opre.1110.0958
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Workers in a bucket brigade production system perform unproductive travel when they walk to get more work from their colleagues. We introduce a new design of bucket brigades to reduce unproductive travel. Under the new design, each worker works on one side of an aisle when he proceeds in one direction and works on the other side when he proceeds in the reverse direction. We propose simple rules for workers to share work under the new design and find a sufficient condition for the system to self-balance. Numerical examples suggest that the improvement in throughput by the new design can be as large as 30%. Even with a 20% reduction in labor, the new design can still increase throughput by 7%.
引用
收藏
页码:1539 / 1545
页数:7
相关论文
共 13 条
[1]  
Alligood K. T., 1996, CHAOS
[2]   Bucket brigades revisited: Are they always effective? [J].
Armbruster, D ;
Gel, ES .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 172 (01) :213-229
[3]   Bucket brigades with worker learning [J].
Armbruster, Dieter ;
Gel, Esma S. ;
Murakami, Junko .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (01) :264-274
[4]  
Bartholdi J. J. III, 2005, Manufacturing & Service Operations Management, V7, P121, DOI 10.1287/msom.1040.0059
[5]   Bucket brigades on in-tree assembly networks [J].
Bartholdi, JJ ;
Eisenstein, DD ;
Lim, YF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) :870-879
[6]   A production line that balances itself [J].
Bartholdi, JJ ;
Eisenstein, DD .
OPERATIONS RESEARCH, 1996, 44 (01) :21-34
[7]   Performance of bucket brigades when work is stochastic [J].
Bartholdi, JJ ;
Eisenstein, DD ;
Foley, RD .
OPERATIONS RESEARCH, 2001, 49 (05) :710-719
[8]   Dynamics of two- and three-worker "bucket brigade" production lines [J].
Bartholdi, JJ ;
Bunimovich, LA ;
Eisenstein, DD .
OPERATIONS RESEARCH, 1999, 47 (03) :488-491
[9]   Deterministic Chaos in a Model of Discrete Manufacturing [J].
Bartholdi, John J., III ;
Eisenstein, Donald D. ;
Lim, Yun Fong .
NAVAL RESEARCH LOGISTICS, 2009, 56 (04) :293-299
[10]   Recovering cyclic schedules using dynamic produce-up-to policies [J].
Eisenstein, DD .
OPERATIONS RESEARCH, 2005, 53 (04) :675-688