Conflicts between owner and contractors: Proposed intervention process

被引:73
作者
Harmon, KMJ [1 ]
机构
[1] Harmon York Assoc, Secaucus, NJ 07004 USA
关键词
dispute resolution; partnerships; owners; contractors; conflict; construction industry;
D O I
10.1061/(ASCE)0742-597X(2003)19:3(121)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The par-ties of a construction contract, the owner and contractor, are a society with a complex set of interrelated relationships requiring cooperation and collaboration to coordinate time, resources, and communication. The main goal of the parties involved in a project's construction is to have a successful project constructed in accordance with the plans and specifications, within the time and cost originally anticipated. The success of a project depends on a number of variables, not the least of which is how the organizations approach problems and conflicts. However, the adversarial atmosphere that infects the industry can prevent the parties from reaching their goal. This paper proposes an intervention process, a combination of partnership and mediation, to prevent and resolve dispute prior to contract close-out.
引用
收藏
页码:121 / 125
页数:5
相关论文
共 45 条
[1]  
[Anonymous], STUDIES LAW POLITICS
[2]  
APPEL ME, 1993, ARBITRAT J, V48, P47
[3]  
Arditi D., 1999, Computer-Aided Civil and Infrastructure Engineering, V14, P385, DOI 10.1111/0885-9507.00157
[4]  
Arditi D., 1998, Computer-Aided Civil and Infrastructure Engineering, V13, P75, DOI 10.1111/0885-9507.00087
[5]  
*ASCE, 1991, AVOID RES DISP DUR C
[6]  
AUGSBURGER DW, 1992, CONFLICT MEDIATION A
[7]  
AUGUSTINE MJ, 1994, NEW YORK LAW J, V1, P3
[8]  
BRAMBLE BB, 1995, TRANSPORTATION RES B, P214
[9]  
Bush R.A. B., 1994, PROMISE MEDIATION
[10]  
CARSMAN HW, 2000, P 2000 MIDYEAR M REA