A polyhedral approach to a production planning problem

被引:7
作者
Constantino, M [1 ]
机构
[1] Univ Lisboa, Fac Ciencias, Dept Estatist & Invest Operac, Ctr Invest Operac, P-1749016 Lisbon, Portugal
关键词
production planning; valid inequalities; cutting plane algorithm;
D O I
10.1023/A:1018963805173
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Production planning in manufacturing industries is concerned with the determination of the production quantities (lot sizes) of some items over a time horizon, in order to satisfy the demand with minimum cost, subject to some production constraints. In general, production planning problems become harder when different types of constraints are present, such as capacity constraints,minimum lot sizes, changeover times, among others. Models incorporating some of these constraints yield, in general, NP-hard problems. We consider a single-machine, multi-item lot-sizing problem, with those difficult characteristics. There is a natural mixed integer programming formulation for this problem. However, the bounds given by linear relaxation are in general weak, so solving this problem by LP based branch and bound is inefficient. In order to improve the LP bounds, we strengthen the formulation by adding cutting planes. Several families of valid inequalities for the set of feasible solutions are derived, and the corresponding separation problems are addressed. The result is a branch and cut algorithm, which is able to solve some real life instances with 5 items and up to 36 periods.
引用
收藏
页码:75 / 95
页数:21
相关论文
共 24 条
[1]   IMPROVED ALGORITHMS FOR ECONOMIC LOT-SIZE PROBLEMS [J].
AGGARWAL, A ;
PARK, JK .
OPERATIONS RESEARCH, 1993, 41 (03) :549-571
[2]  
BARANY I, 1984, MATH PROGRAM STUD, V22, P32, DOI 10.1007/BFb0121006
[3]   STRONG FORMULATIONS FOR MULTI-ITEM CAPACITATED LOT SIZING [J].
BARANY, I ;
VANROY, TJ ;
WOLSEY, LA .
MANAGEMENT SCIENCE, 1984, 30 (10) :1255-1261
[4]   A cutting plane approach to capacitated lot-sizing with start-up costs [J].
Constantino, M .
MATHEMATICAL PROGRAMMING, 1996, 75 (03) :353-376
[5]  
CONSTANTINO M, 1996, VALID INEQUALITIES L
[6]  
CONSTANTINO M, 1995, THESIS U CATHOLIQUE
[7]  
*CPLEX OPT INC, 1994, US CPLEX CALL LIB CP
[8]   A SIMPLE FORWARD ALGORITHM TO SOLVE GENERAL DYNAMIC LOT SIZING MODELS WITH N PERIODS IN 0(N LOG N) OR 0(N) TIME [J].
FEDERGRUEN, A ;
TZUR, M .
MANAGEMENT SCIENCE, 1991, 37 (08) :909-925
[9]   FACETS AND ALGORITHMS FOR CAPACITATED LOT SIZING [J].
LEUNG, JMY ;
MAGNANTI, TL ;
VACHANI, R .
MATHEMATICAL PROGRAMMING, 1989, 45 (02) :331-359
[10]   A STRONG CUTTING PLANE ALGORITHM FOR PRODUCTION SCHEDULING WITH CHANGEOVER COSTS [J].
MAGNANTI, TL ;
VACHANI, R .
OPERATIONS RESEARCH, 1990, 38 (03) :456-473