Performance of bed-load transport equations relative to geomorphic significance: Predicting effective discharge and its transport rate

被引:48
作者
Barry, Jeffrey J. [1 ]
Buffington, John M. [2 ]
Goodwin, Peter
Asce, M. [3 ]
King, John G. [2 ]
Emmett, William W.
机构
[1] ENVIRON Internatl Corp, Seattle, WA 98104 USA
[2] Idaho Water Ctr, US Forest Serv, Rocky Mt Res Stn, Boise, ID 83702 USA
[3] Univ Idaho, Idaho Water Ctr, Dept Civil Engn, Ctr Ecohydraul Res, Boise, ID 83702 USA
关键词
D O I
10.1061/(ASCE)0733-9429(2008)134:5(601)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Previous studies assessing the accuracy of bed-load transport equations have considered equation performance statistically based on paired observations of measured and predicted bed-load transport rates. However, transport measurements were typically taken during low flows, biasing the assessment of equation performance toward low discharges, and because equation performance can vary with discharge, it is unclear whether previous assessments of performance apply to higher, geomorphically significant flows (e.g., the bankfull or effective discharges). Nor is it clear whether these equations can predict the effective discharge, which depends on the accuracy of the bed-load transport equation across a range of flows. Prediction of the effective discharge is particularly important in stream restoration projects, as it is frequently used as an index value for scaling channel dimensions and for designing dynamically stable channels. In this study, we consider the geomorphic performance of five bed-load transport equations at 22 gravel-bed rivers in mountain basins of the western United States. Performance is assessed in terms of the accuracy with which the equations are able to predict the effective discharge and its bed-load transport rate. We find that the median error in predicting effective discharge is near zero for all equations, indicating that effective discharge predictions may not be particularly sensitive to one's choice of bed-load transport equation. However, the standard deviation of the prediction error differs between equations (ranging from 10% to 60%), as does their ability to predict the transport rate at the effective discharge (median errors of less than I to almost 2.5 orders of magnitude). A framework is presented for standardizing the transport equations to explain observed differences in performance and to explore sensitivity of effective discharge predictions.
引用
收藏
页码:601 / 615
页数:15
相关论文
共 42 条
[1]  
Ackers P., 1973, J HYDRAULIC DIVISON, V99, P2041, DOI DOI 10.1002/9781118669709
[3]   AN EMPIRICAL CORRELATION OF BEDLOAD TRANSPORT RATES IN FLUMES AND NATURAL RIVERS [J].
BAGNOLD, RA .
PROCEEDINGS OF THE ROYAL SOCIETY OF LONDON SERIES A-MATHEMATICAL PHYSICAL AND ENGINEERING SCIENCES, 1980, 372 (1751) :453-473
[4]   A general power equation for predicting bed load transport rates in gravel bed rivers (vol 40, art no W10401, 2007) [J].
Barry, Jeffrey J. ;
Buffington, John M. ;
King, John G. .
WATER RESOURCES RESEARCH, 2007, 43 (08)
[5]   Reply to comment by Claude Michel on "A general power equation for predicting bed load transport rates in gravel bed rivers" [J].
Barry, JJ ;
Buffington, JM ;
King, JG .
WATER RESOURCES RESEARCH, 2005, 41 (07)
[6]  
Biedenharn DS., 2001, INT J SEDIMENT RES, V16, P445
[7]   Bedload transport in alluvial channels [J].
Bravo-Espinosa, M ;
Osterkamp, WR ;
Lopes, VL .
JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 2003, 129 (10) :783-795
[8]   A systematic analysis of eight decades of incipient motion studies, with special reference to gravel-bedded rivers [J].
Buffington, JM ;
Montgomery, DR .
WATER RESOURCES RESEARCH, 1997, 33 (08) :1993-2029
[9]   Measurement of coarse gravel and cobble transport using portable bedload traps [J].
Bunte, K ;
Abt, SR ;
Potyondy, JP ;
Ryan, SE .
JOURNAL OF HYDRAULIC ENGINEERING, 2004, 130 (09) :879-893