An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system

被引:36
作者
Das, SR
Canel, C
机构
[1] Univ N Carolina, Dept Informat Syst & Operat Management, Wilmington, NC 28403 USA
[2] George Mason Univ, Sch Management, Fairfax, VA 22030 USA
关键词
flexible manufacturing systems; branch and bound algorithms;
D O I
10.1016/j.ijpe.2004.07.006
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This research addresses the problem of scheduling batches of parts in a flexible manufacturing system (FMS). Due to the use of serial access material-handling systems in many FMSs, the problem is modeled for a multi-cell FMS with flowshop characteristics. A branch and bound solution method is developed which exploits the special structure of the problem to develop strong lower bounds. Numerical computations show that the branch and bound algorithm solves large size problems in a reasonable time. Computational results are provided for a variety of test problems. (c) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:247 / 262
页数:16
相关论文
共 37 条
[1]  
[Anonymous], 1970, MANAGE SCI, DOI [10.1287/mnsc.16.10.b630, DOI 10.1287/MNSC.16.10.B630]
[2]   SCHEDULING AND CONTROL OF FLEXIBLE MANUFACTURING SYSTEMS - A CRITICAL-REVIEW [J].
BASNET, C ;
MIZE, JH .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1994, 7 (06) :340-355
[3]   A METHOD OF FLEXIBLE SCHEDULING FOR FLEXIBLE MANUFACTURING SYSTEMS [J].
CHOI, JG ;
HITOMI, K ;
ECON, P ;
ECON, PE .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 33 (1-3) :247-255
[4]   2 MACHINE FLOW SHOP SCHEDULING PROBLEMS WITH SEQUENCE DEPENDENT SETUP TIMES - DYNAMIC-PROGRAMMING APPROACH [J].
CORWIN, BD ;
ESOGBUE, AO .
NAVAL RESEARCH LOGISTICS, 1974, 21 (03) :515-524
[5]  
Denizel M, 1998, J OPER RES SOC, V49, P659
[6]   Exact solution procedures for certain planning problems in flexible manufacturing systems [J].
Denizel, M ;
Erenguc, SS .
COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (11) :1043-1055
[7]   HEURISTICS FOR SCHEDULING FLEXIBLE FLOW LINES [J].
DING, FY ;
KITTICHARTPHAYAK, D .
COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 26 (01) :27-34
[8]  
French S., 1982, Sequencing and Scheduling
[9]   FLEXIBLE MANUFACTURING SYSTEMS - AN INVESTIGATION FOR RESEARCH AND APPLICATIONS [J].
GUNASEKARAN, A ;
MARTIKAINEN, T ;
YLIOLLI, P .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 66 (01) :1-26
[10]   THE 2-MACHINE SEQUENCE DEPENDENT FLOWSHOP SCHEDULING PROBLEM [J].
GUPTA, JND ;
DARROW, WP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1986, 24 (03) :439-446