Optimization of injection-production adjustment plans of prevention and control measures against casing failure in N2 index bed

被引:0
作者
Cui, Yueming [1 ]
Liu, Yazhen
机构
[1] Northeast Petr Univ, Coll Petr Engn, Daqing, Peoples R China
来源
ADVANCES IN ENERGY SCIENCE AND EQUIPMENT ENGINEERING | 2015年
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The situation of casing damage in N2 index bed is becoming more and more serious, and it will restrain the economic benefit and production development of the oilfield and aggravates the trend of casing damage, so making effective prevention and control measures is extra significant. Casing damage in N2 index bed is caused by formation glide, making 3 kinds of injection and production adjustment schemes according to the reasons of formation glide, acquiring respectively variation regularities of maximum formation slippage and dimension, and the optimizing of the best scheme.
引用
收藏
页码:2427 / 2430
页数:4
相关论文
共 8 条
[1]  
Bruno M.S., 1992, SPE DRILLING ENG
[2]  
Chi-Ai, 2003, MECH THEORETIC MODEL
[3]  
Haiqing-Li, 2005, OIL FIELD EQUIPMENT, V34, P96
[4]  
Jianzhong-Liu, 2001, ACTA PETROLEI SINICA, V03
[5]  
Sayyaf M., 2014, MATURAL HAZARDS JUN, P309
[6]  
Tianyu-Chen, 2004, J HARBIN ENG U, V25, P104
[7]  
Tingting-Li, 2014, J YANGTZE U, V11, P96
[8]  
Xiuting-Han, 2001, CASING DAMAGE MECH D