A heuristic to control integrated multi-product multi-machine production-inventory systems with job shop routings and stochastic arrival, set-up and processing times

被引:10
作者
Van Nyen, PLM
Bertrand, JWM
Van Oijen, HPG
Vandaele, NJ
机构
[1] Tech Univ Eindhoven, Dept Technol Management, NL-5600 MB Eindhoven, Netherlands
[2] Univ Antwerp, B-2020 Antwerp, Belgium
关键词
production-inventory system; queueing network analyser; production control; inventory control; performance analysis;
D O I
10.1007/s00291-005-0200-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper investigates a multi-product multi-machine production-inventory system, characterized by job shop routings and stochastic demand interarrival times, set-up times and processing times. The inventory points and the production system are controlled integrally by a centralized decision maker. We present a heuristic that minimizes the relevant costs by making near-optimal production and inventory control decisions while target customer service levels are satisfied. The heuristic is tested in an extensive simulation study and the results are discussed.
引用
收藏
页码:399 / 434
页数:36
相关论文
共 34 条