Overcoming technical barriers and risks in the application of building integrated photovoltaics (BIPV): hardware and software strategies

被引:68
作者
Yang, Rebecca Jing [1 ]
机构
[1] RMIT Univ, Sch Property Construct & Project Management, Melbourne, Vic 3000, Australia
关键词
Building integrated photovoltaic; Building sustainability; Technical barrier; Hardware; Software; Stakeholder; OF-THE-ART; DESIGN; ENERGY; CONSTRUCTION; PERFORMANCE; SYSTEMS; IMPLEMENTATION; ISSUES; PANELS;
D O I
10.1016/j.autcon.2014.12.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Building Integrated Photovoltaics (BIPV) is a smart energy production system that incorporates solar PV panels as part of the roof, windows, facades and shading devices. BIPV products development has been ongoing for the past 30 years, but their practical applications have been slow in comparison to conventional rack-mounted solar PV. One of the main reasons is that the technical barriers, which span from design phase through to commissioning and maintenance phases, have not been understood by stakeholders. The aim of this research is to identify the technical barriers and risks associated with the application of BIPV from building design through to operation stages, together with proposing possible solutions. Where a solution could not be proposed, recommendations for future research and development are made. A four-step research approach is employed, which includes examination of previous publications and collection of feedback from the industry professionals. The research highlighted the importance to apply advanced simulation tools and energy performance monitoring platforms in practice, and encourage stakeholder collaborations in the whole supply chain. This paper contributes to the BIPV area by providing structured knowledge from systematic and longitudinal perspective in relation to the technical barriers and risks, to help professionals understand and improve their knowledge. This paper also makes a unique contribution to the research arena by providing a conceptual model of the associated barriers and risks from life-cycle perspective together with proposing five directions for future research. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:92 / 102
页数:11
相关论文
共 67 条
  • [1] An insight into real-time performance assessment of a building integrated photovoltaic (BIPV) installation in Bangalore (India)
    Aaditya, Gayathri
    Pillai, Rohit
    Mani, Monto
    [J]. ENERGY FOR SUSTAINABLE DEVELOPMENT, 2013, 17 (05) : 431 - 437
  • [2] Life cycle cost assessment of building integrated photovoltaic thermal (BIPVT) systems
    Agrawal, Basant
    Tiwari, G. N.
    [J]. ENERGY AND BUILDINGS, 2010, 42 (09) : 1472 - 1481
  • [3] Zero-Carbon Homes: A Road Map
    Allan, Andrew
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2013, 31 (07) : 782 - 787
  • [4] The need of sustainable buildings construction in the Kingdom of Bahrain
    Alnaser, N. W.
    Flanagan, R.
    [J]. BUILDING AND ENVIRONMENT, 2007, 42 (01) : 495 - 506
  • [5] Australian Solar Institute, 2010, STRAT PLAN 2010 2014
  • [6] A general approach toward building integrated photovoltaic systems and its implementation barriers: A review
    Azadian, Farshad
    Radzi, M. A. M.
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2013, 22 : 527 - 538
  • [7] Photovoltaic roofing: issues of design and integration into buildings
    Bahaj, AS
    [J]. RENEWABLE ENERGY, 2003, 28 (14) : 2195 - 2204
  • [8] A review of progress in renewable energy implementation in the Gulf Cooperation Council countries
    Bhutto, Abdul Waheed
    Bazmi, Aqeel Ahmed
    Zahedi, Gholamreza
    Klemes, Jiri Jaromir
    [J]. JOURNAL OF CLEANER PRODUCTION, 2014, 71 : 168 - 180
  • [9] 'State-of-the-art' of building integrated photovoltaic products
    Ceron, Isabel
    Caamano-Martin, E.
    Javier Neila, F.
    [J]. RENEWABLE ENERGY, 2013, 58 : 127 - 133
  • [10] A critical analysis of recent advances in the techniques for the evaluation of renewable energy projects
    Chang, Chen-Yu
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (07) : 1057 - 1067