Feature Selection for Waiting Time Predictions in Semiconductor Wafer Fabs

被引:2
|
作者
Schelthoff, Kai [1 ]
Jacobi, Christoph [2 ]
Schlosser, Eva [2 ]
Plohmann, David [2 ]
Janus, Michel [1 ]
Furmans, Kai [2 ]
机构
[1] Robert Bosch GmbH, RtP1 MFD2 SCO Dept, D-72762 Reutlingen, Germany
[2] Karlsruhe Inst Technol, Inst Mat Handling & Logist, D-76131 Karlsruhe, Germany
关键词
Production; Queueing analysis; Predictive models; Semiconductor device modeling; Feature extraction; Analytical models; Task analysis; Semiconductor manufacturing; high product-mix low-volume; feature selection; waiting time prediction; random forest regression; machine learning; permutation feature importance; JOB CYCLE TIME; ENSEMBLE;
D O I
10.1109/TSM.2022.3182855
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Based on real operational data from the Robert Bosch GmbH, we investigate influencing features for waiting time estimation of operations in high product-mix / low-volume semiconductor manufacturing fabs. We define waiting time as the elapsed time between completing the previous operation and starting the next one. In addition to well-established features, we introduce novel features to capture the complexity of the manufacturing environment. To the best of our knowledge, we are the first to attempt waiting time estimation in a high product-mix / low-volume semiconductor fab. We present a framework for feature selection which is composed of three steps: First, random forest models are trained for each operation. Second, a permutation feature importance (PFI) for the full set of features for each operation is computed and the performance is statistically evaluated. The optimal subset of features is then chosen by a sequential backward search based on the PFI values. Third, the performance in terms of the coefficient of determination of each optimized model is evaluated by means of the initial performance. We apply the framework to real operational data from the production areas Lithography and Diffusion and conclude that the feature set can be reduced significantly, while the prediction performance remains equal. The novel features are found to be frequently used when estimating waiting times in the investigated use case.
引用
收藏
页码:546 / 555
页数:10
相关论文
共 50 条
  • [1] A Data Driven Cycle Time Prediction With Feature Selection in a Semiconductor Wafer Fabrication System
    Wang, Junliang
    Zhang, Jie
    Wang, Xiaoxi
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2018, 31 (01) : 173 - 182
  • [2] Key Feature Identification for Monitoring Wafer-to-Wafer Variation in Semiconductor Manufacturing
    Fan, Shu-Kai S.
    Hsu, Chia-Yu
    Tsai, Du-Ming
    Chou, Mabel C.
    Jen, Chih-Hung
    Tsou, Jen-Hsuan
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2022, 19 (03) : 1530 - 1541
  • [3] Optimal Feature Selection for Defect Classification in Semiconductor Wafers
    Gomez-Sirvent, Jose L.
    de la Rosa, Francisco Lopez
    Sanchez-Reolid, Roberto
    Fernandez-Caballero, Antonio
    Morales, Rafael
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2022, 35 (02) : 324 - 331
  • [4] Big data analytics for cycle time related feature selection in the semiconductor wafer fabrication system
    Wang, Junliang
    Zheng, Peng
    Zhang, Jie
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 143
  • [5] Data-driven Feature Selection for Cycle-time Forecasting in Semiconductor Wafer Fabrication System
    Wang, Jun-liang
    Zhang, Jie
    2015 INTERNATIONAL CONFERENCE ON INFORMATION SCIENCE AND MANAGEMENT ENGINEERING (ICISME 2015), 2015, : 148 - 153
  • [6] Hybrid Feature Selection for Wafer Acceptance Test Parameters in Semiconductor Manufacturing
    Xu, Hongwei
    Zhang, Jie
    Lv, Youlong
    Zheng, Peng
    IEEE ACCESS, 2020, 8 : 17320 - 17330
  • [7] An Analytical Model for Conveyor-Based Material Handling System With Crossovers in Semiconductor Wafer Fabs
    Nazzal, Dima
    Jimenez, Jesus A.
    Carlo, Hector J.
    Johnson, Andrew L.
    Lasrado, Vernet
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2010, 23 (03) : 468 - 476
  • [8] Optimising the location of crossovers in conveyor-based automated material handling systems in semiconductor wafer fabs
    Hong, Soondo
    Johnson, Andrew L.
    Carlo, Hector J.
    Nazzal, Dima
    Jimenez, Jesus A.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (20) : 6199 - 6226
  • [9] Branch selection and data optimization for selecting machines for processes in semiconductor manufacturing using AI-based predictions
    Stich, Peter
    Busch, Rebecca
    Wahl, Michael
    Weber, Christian
    Fathi, Madjid
    2021 IEEE INTERNATIONAL CONFERENCE ON ELECTRO INFORMATION TECHNOLOGY (EIT), 2021, : 292 - 297
  • [10] Improving dengue fever predictions in Taiwan based on feature selection and random forests
    Kuo, Chao-Yang
    Yang, Wei-Wen
    Su, Emily Chia-Yu
    BMC INFECTIOUS DISEASES, 2024, 24 (SUPPL 2)