Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints

被引:64
作者
Chen, JF
Wu, TH
机构
[1] Feng Chia Univ, Dept Ind Engn, Taichung 40724, Taiwan
[2] Da Yeh Univ, Dept Ind Engn, Changhua 51505, Taiwan
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2006年 / 34卷 / 01期
关键词
setup; threshold-accepting method; total tardiness; unrelated parallel machine;
D O I
10.1016/j.omega.2004.07.023
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This research deals with scheduling jobs on unrelated parallel machines with auxiliary equipment constraints. Each job has a due date and requires a single operation. A setup for dies is incurred if there is a switch from processing one type of job to another type. For a die type, the number of dies is limited. Due to the attributes of the machines and the fitness of dies to each, the processing time for a job depends on the machine on which the job is processed, each job being restricted to processing on certain machines. In this paper, an effective heuristic based on threshold-accepting methods, tabu lists, and improvement procedures is proposed to minimize total tardiness. An extensive experiment is conducted to evaluate the computational characteristics of the proposed heuristic. Computational experiences demonstrate that the proposed heuristic is capable of obtaining optimal solutions for small-sized problems, and significantly outperforms an ATCS procedure and a simulated annealing method for problems in larger sizes. (c) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:81 / 89
页数:9
相关论文
共 33 条
[21]   THE TOTAL TARDINESS PROBLEM - REVIEW AND EXTENSIONS [J].
KOULAMAS, C .
OPERATIONS RESEARCH, 1994, 42 (06) :1025-1041
[22]   ON SCHEDULING PROBLEMS WITH DEFERRAL COSTS [J].
LAWLER, EL .
MANAGEMENT SCIENCE, 1964, 11 (02) :280-288
[23]   Scheduling jobs on parallel machines with sequence-dependent setup times [J].
Lee, YH ;
Pinedo, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (03) :464-474
[24]   SCHEDULE GENERATION AND RECONFIGURATION FOR PARALLEL MACHINES [J].
LUH, PB ;
HOITOMT, DJ ;
MAX, E ;
PATTIPATI, KR .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1990, 6 (06) :687-696
[25]   Search heuristics for a parallel machine scheduling problem with ready times and due dates [J].
Park, MW ;
Kim, YD .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (3-4) :793-796
[26]  
POTTS CN, 1982, OPNS RES LETT, V1, P177
[27]   Evaluating scheduling heuristics for non-identical parallel processors [J].
Randhawa, SU ;
Kuo, CH .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (04) :969-981
[28]   SCHEDULING WITH DEADLINES AND LOSS FUNCTIONS ON K PARALLEL MACHINES [J].
ROOT, JG .
MANAGEMENT SCIENCE, 1965, 11 (03) :460-475
[29]   Parallel machine scheduling with release dates, due dates and family setup times [J].
Schutten, JMJ ;
Leussink, RAM .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1996, 46 :119-125
[30]   MINIMIZING MAXIMUM TARDINESS FOR UNRELATED PARALLEL MACHINES [J].
SURESH, V ;
CHAUDHURI, D .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 34 (02) :223-229