Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints

被引:65
作者
Chen, JF
Wu, TH
机构
[1] Feng Chia Univ, Dept Ind Engn, Taichung 40724, Taiwan
[2] Da Yeh Univ, Dept Ind Engn, Changhua 51505, Taiwan
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2006年 / 34卷 / 01期
关键词
setup; threshold-accepting method; total tardiness; unrelated parallel machine;
D O I
10.1016/j.omega.2004.07.023
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This research deals with scheduling jobs on unrelated parallel machines with auxiliary equipment constraints. Each job has a due date and requires a single operation. A setup for dies is incurred if there is a switch from processing one type of job to another type. For a die type, the number of dies is limited. Due to the attributes of the machines and the fitness of dies to each, the processing time for a job depends on the machine on which the job is processed, each job being restricted to processing on certain machines. In this paper, an effective heuristic based on threshold-accepting methods, tabu lists, and improvement procedures is proposed to minimize total tardiness. An extensive experiment is conducted to evaluate the computational characteristics of the proposed heuristic. Computational experiences demonstrate that the proposed heuristic is capable of obtaining optimal solutions for small-sized problems, and significantly outperforms an ATCS procedure and a simulated annealing method for problems in larger sizes. (c) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:81 / 89
页数:9
相关论文
共 33 条
[1]   Scheduling parallel machines to minimize total weighted and unweighted tardiness [J].
Alidaee, B ;
Rosa, D .
COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (08) :775-788
[2]   WEIGHTED-TARDINESS SCHEDULING ON PARALLEL MACHINES WITH PROPORTIONAL WEIGHTS [J].
ARKIN, EM ;
ROUNDY, RO .
OPERATIONS RESEARCH, 1991, 39 (01) :64-81
[3]   Tabu search for scheduling on identical parallel machines to minimize mean tardiness [J].
Armentano, VA ;
Yamashita, DS .
JOURNAL OF INTELLIGENT MANUFACTURING, 2000, 11 (05) :453-460
[4]   Tardiness minimization on parallel machines [J].
Azizoglu, M ;
Kirca, O .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1998, 55 (02) :163-168
[5]  
BAKER KR, 1973, INT J PROD RES, V11, P125
[6]  
Barnes J. W., 1977, AIIE Transactions, V9, P25, DOI 10.1080/05695557708975117
[7]   Scheduling identical jobs with unequal ready times on uniform parallel machines to minimize the maximum lateness [J].
Dessouky, MM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 34 (04) :793-806
[8]   EVALUATION OF A HEURISTIC FOR SCHEDULING INDEPENDENT JOBS ON PARALLEL IDENTICAL PROCESSORS [J].
DOGRAMACI, A ;
SURKIS, J .
MANAGEMENT SCIENCE, 1979, 25 (12) :1208-1216
[10]   THRESHOLD ACCEPTING - A GENERAL-PURPOSE OPTIMIZATION ALGORITHM APPEARING SUPERIOR TO SIMULATED ANNEALING [J].
DUECK, G ;
SCHEUER, T .
JOURNAL OF COMPUTATIONAL PHYSICS, 1990, 90 (01) :161-175