A MODEL FOR PRIORITIZATION OF RAIL INFRASTRUCTURE PROJECTS USING ANP

被引:0
作者
Macura, Dragana [1 ]
Boskovic, Branislav
Bojovic, Nebojsa [1 ]
Milenkovic, Milos [1 ]
机构
[1] Univ Belgrade, Fac Transport & Traff Engn, Belgrade 11001, Serbia
关键词
Railway; Projects prioritization; Analytic network process; TRANSPORT; SELECTION; INVESTMENT;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Project prioritization in the public sector is in general a very complex and delicate problem due to huge investments, limited budget, conflicts between relevant criteria, influences of the actual state of politics and government. In this paper, we have considered the problem related to ranking of rail infrastructure investment projects. Having considered the nature of the problem, the most suitable method for solving the issue is the Multi-criteria Analytic Network Process. A model for prioritization of rail projects based on a case study of a part of the rail network belonging to Corridor X in the Republic of Serbia has been developed.
引用
收藏
页码:285 / 309
页数:25
相关论文
共 37 条
[1]   Railway projects prioritisation for investment: Application of goal programming [J].
Ahern, Aoife ;
Anandarajah, Gabrial .
TRANSPORT POLICY, 2007, 14 (01) :70-80
[2]  
Aldian A., 2005, J E ASIA SOC TRANSP, V6, P3948, DOI DOI 10.11175/EASTS.6.3948
[3]  
Begicevic N., 2009, CENTRAL EUROPEAN J O, V18, P341
[4]  
Berechman J., 2010, TRANSPORTATION, V32, P223
[5]   An integrated analytic approach for Six Sigma project selection [J].
Buyukozkan, Gulcin ;
Ozturkcan, Demet .
EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (08) :5835-5847
[6]   A decision support approach for the evaluation of transport investment alternatives [J].
Caliskan, Nurbanu .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (03) :1696-1704
[7]   Using ANP priorities with goal programming for revitalization strategies in historic transport: A case study of the Alishan Forest Railway [J].
Chang, Yu-Hern ;
Wey, Wann-Ming ;
Tseng, Hsiao-Yu .
EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (04) :8682-8690
[8]  
Chao Liang, 2008, International Journal of Project Management, V26, P810, DOI 10.1016/j.ijproman.2007.11.001
[9]   Analytic network process applied to project selection [J].
Cheng, EWL ;
Li, H .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (04) :459-466
[10]  
Cheng-Wei Su, 2006, Journal of Civil Engineering and Management, V12, P285