共 80 条
- [1] Cost contingency management [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2007, 23 (03) : 140 - 146
- [2] Borucka E., 1982, WISSENSCHAFTLICHE Z, P129
- [3] Burger R., 2003, J COST ENG, V45, P12
- [4] Dziadosz A., 2008, STRATEGIE ZARZADZANA, P29
- [5] Dziadosz A., 2010, Przegl4d Budowlany, V7-8, P76
- [6] Gajzler M., 2008, THESIS POZNAN U TECH
- [7] Hybrid advisory systems and the possibilities of it usage in the process of industrial flooring repairs [J]. 25TH INTERNATIONAL SYMPOSIUM ON AUTOMATION AND ROBOTICS IN CONSTRUCTION - ISARC-2008, 2008, : 459 - 464
- [9] Goldratt E.M., 1997, CRITICAL CHAIN
- [10] Compass - New paradigm for project cost control strategy and planning [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (03): : 254 - 264