Exact algorithm for matrix-based project planning problems

被引:33
作者
Kosztyan, Zsolt T. [1 ]
机构
[1] Univ Pannonia, Dept Quantitat Methods, Veszprem, Hungary
关键词
Project planning methods; Decision-making tools; Exact algorithms; Supporting traditional and agile project managements; EVIDENTIAL REASONING APPROACH; PROCESS ARCHITECTURE; EXPERT-SYSTEM; SELECTION; CRITERIA; MODEL; COST; MANAGEMENT; METHODOLOGIES; DESIGN;
D O I
10.1016/j.eswa.2015.01.066
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper proposes a new matrix-based project planning method that takes into consideration task importance or probability of completions thus determines and ranks the importance or probability of possible project scenarios and project structures. The proposed algorithm is fast, aims to select the most important project scenarios or the least cost/time demanding project structures. The algorithm is generic, can host several types of goals dictated by the characteristics of project management and as such can be the fundamental element of a project expert- and decision-making system. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:4460 / 4473
页数:14
相关论文
共 71 条
[1]   Software project management with GAs [J].
Alba, Enrique ;
Chicano, J. Francisco .
INFORMATION SCIENCES, 2007, 177 (11) :2380-2401
[2]  
Arditi D., 1989, International Journal of Project Management, V7, P141, DOI 10.1016/0263-7863(89)90032-X
[3]  
Badukale P.A., 2014, International Journal Of Modern Engineering Research, V4, P45
[4]   RECENT ADVANCES IN R AND D BENEFIT MEASUREMENT AND PROJECT SELECTION METHODS [J].
BAKER, N ;
FREELAND, J .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (10) :1164-1175
[5]  
Boehm B.W., 2000, Software Cost Estimation with COCOMO II
[6]   Modeling impacts of process architecture on cost and schedule risk in product development [J].
Browning, TR ;
Eppinger, SD .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2002, 49 (04) :428-442
[7]   Managing complex project process models with a process architecture framework [J].
Browning, Tyson R. .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (02) :229-241
[8]   Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41
[9]  
Burger R., 1985, INTERNET SEM
[10]   Using the analytic hierarchy process in new product screening [J].
Calantone, RJ ;
Di Benedetto, CA ;
Schmidt, JB .
JOURNAL OF PRODUCT INNOVATION MANAGEMENT, 1999, 16 (01) :65-76