A delayed optimal control model for multi-stage production-inventory system with production lead times

被引:6
作者
Pooya, Alireza [1 ]
Pakdaman, Morteza [2 ]
机构
[1] Ferdowsi Univ Mashhad, Dept Management, Mashhad, Iran
[2] Ferdowsi Univ Mashhad, Dept Appl Math, Mashhad, Iran
关键词
Lead time; Optimal control; Time delay system; Production-inventory system; DEMAND;
D O I
10.1007/s00170-017-0942-5
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper attempts to propose a new multi-stage production-inventory system with and without lead times via an optimal control model. The proposed optimal control model for lead times contains some delays in the state variables. The considered dynamical system is a multi-stage production-inventory one which obeys a linear quadratic optimal control model with time delays in the states. Production lead times can be considered as required time for production. In the proposed system, the inventories of stocks are considered as state variables while the demand and ordering levels are control variables. In the proposed multi-stage system, returned items from one stock to the previous one is allowed with recycling. The exact solution of non-delay model along with the approximate solution of delayed system are obtained and compared in a real case study in granular polymer industry which the products are 3D panels and expanded polystyrene (EPS) blocks.
引用
收藏
页码:751 / 761
页数:11
相关论文
共 24 条
[1]  
[Anonymous], 2012, Optimal Control Theory: An Introduction
[2]   Impact of lead time variability in supply chain risk management [J].
Bandaly, Dia ;
Satir, Ahmet ;
Shanker, Latha .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2016, 180 :88-100
[3]   Optimal Control of an Assembly System with Multiple Stages and Multiple Demand Classes [J].
Benjaafar, Saif ;
ElHafsi, Mohsen ;
Lee, Chung-Yee ;
Zhou, Weihua .
OPERATIONS RESEARCH, 2011, 59 (02) :522-529
[4]   PRODUCTION PLANNING IN A THREE-STOCK REVERSE-LOGISTICS SYSTEM WITH DETERIORATING ITEMS UNDER A PERIODIC REVIEW POLICY [J].
Bouras, Abdelghani ;
Hedjar, Ramdane ;
Tadj, Lotfi .
JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2016, 12 (03) :1075-1089
[5]  
Csik A., 2010, ACTA TECHNICA JAURIN, V3, P231
[6]   Optimal control problem via neural networks [J].
Effati, Sohrab ;
Pakdaman, Morteza .
NEURAL COMPUTING & APPLICATIONS, 2013, 23 (7-8) :2093-2100
[7]   A multi-stage production-inventory model with learning and forgetting effects, rework and scrap [J].
Glock, Christoph H. ;
Jaber, Mohamad Y. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (02) :708-720
[8]   Coordinating supply chains with stochastic demand by crashing lead times [J].
Heydari, Jafar ;
Zaabi-Ahmadi, Payam ;
Choi, Tsan-Ming .
COMPUTERS & OPERATIONS RESEARCH, 2018, 100 :394-403
[9]   Optimizing a multi-stage production/inventory system by DC programming based approaches [J].
Hoai An Le Thi ;
Duc Quynh Tran .
COMPUTATIONAL OPTIMIZATION AND APPLICATIONS, 2014, 57 (02) :441-468
[10]  
Keller Andre A., 2010, Recent Advances in Applied Mathematics. Proceedings of the American Conference on Applied Mathematics (AMERICAN-MATH 2010), P278