The multi resource leveling and materials procurement problem: an integrated approach

被引:17
作者
Almatroushi, Hessa [1 ]
Hariga, Moncer [2 ]
As'ad, Rami [2 ]
Al-Bar, AbdulRahman [2 ]
机构
[1] Amer Univ Sharjah, Engn Syst Management Program, Sharjah, U Arab Emirates
[2] Amer Univ Sharjah, Dept Ind Engn, Sharjah, U Arab Emirates
关键词
Project management; Scheduling; Optimization; Integration; PARTICLE SWARM OPTIMIZATION; CONSTRUCTION; ALLOCATION; MODEL; ALGORITHM; SYSTEM;
D O I
10.1108/ECAM-10-2019-0563
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose This paper proposes an integrated approach that seeks to jointly optimize project scheduling and material lot sizing decisions for time-constrained project scheduling problems. Design/methodology/approach A mixed integer linear programming model is devised, which utilizes the splitting of noncritical activities as a mean toward leveling the renewable resources. The developed model minimizes renewable resources leveling costs along with consumable resources related costs, and it is solved using IBM ILOG CPLEX optimization package. A hybrid metaheuristic procedure is also proposed to efficiently solve the model for larger projects with complex networks structure. Findings The results confirmed the significance of the integrated approach as both the project schedule and the material ordering policy turned out to be different once compared to the sequential approach under same parameter settings. Furthermore, the integrated approach resulted in substantial total costs reduction for low values of the acquiring and releasing costs of the renewable resources. Computational experiments conducted over 240 test instances of various sizes, and complexities illustrate the efficiency of the proposed metaheuristic approach as it yields solutions that are on average 1.14% away from the optimal ones. Practical implications This work highlights the necessity of having project managers address project scheduling and materials lot sizing decisions concurrently, rather than sequentially, to better level resources and minimize materials related costs. Significant cost savings were generated through the developed model despite the use of a small-scale example which illustrates the great potential that the integrated approach has in real life projects. For real life projects with complex network topology, practitioners are advised to make use of the developed metaheuristic procedure due to its superior time efficiency as compared to exact solution methods. Originality/value The sequential approach, wherein a project schedule is established first followed by allocating the needed resources, is proven to yield a nonoptimized project schedule and materials ordering policy, leading to an increase in the project's total cost. The integrated approach proposed hereafter optimizes both decisions at once ensuring the timely completion of the project at the least possible cost. The proposed metaheuristic approach provides a viable alternative to exact solution methods especially for larger projects.
引用
收藏
页码:2135 / 2161
页数:27
相关论文
共 47 条
[31]   Mixed-integer linear programming for resource leveling problems [J].
Rieck, Julia ;
Zimmermann, Juergen ;
Gather, Thorsten .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 221 (01) :27-37
[32]   Optimizing Material Procurement and Storage on Construction Sites [J].
Said, Hisham ;
El-Rayes, Khaled .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (06) :421-431
[33]   Causes and effects of delays in Malaysian construction industry [J].
Sambasivan, Murali ;
Soon, Yau Wen .
International Journal of Project Management, 2007, 25 (05) :517-526
[34]   Construction resource leveling using neural networks [J].
Savin, D ;
Alkass, S ;
Fazio, P .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 1996, 23 (04) :917-925
[35]  
Sawik Tadeusz, 2007, International Transactions in Operational Research, V14, P491, DOI 10.1111/j.1475-3995.2007.00609.x
[36]  
Shtub A., 1988, Constr Manag Econ, V6, P261, DOI [10.1080/01446198800000023, DOI 10.1080/01446198800000023]
[37]  
Smith-Danials D.E., 1984, Journal of Operations Management, V4, P369, DOI DOI 10.1016/0272-6963(84)90022-6
[38]   Binary resource leveling model: Activity splitting allowed [J].
Son, J ;
Mattila, KG .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (06) :887-894
[39]   Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach [J].
Son, J ;
Skibniewski, MJ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (01) :23-31
[40]   Integrated planning of project scheduling and material procurement considering the environmental impacts [J].
Tabrizi, Babak H. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 120 :103-115