IMPROVABILITY OF THE FABRICATION LINE IN A SHIPYARD

被引:5
作者
Neven, Hadzic [1 ]
Viktor, Lozar [1 ]
Tihomir, Opetuk [1 ]
Hrvoje, Cajner [1 ]
机构
[1] Univ Zagreb, Fac Mech Engn & Naval Architecture, Ivana Lucica 5, Zagreb 10000, Croatia
来源
BRODOGRADNJA | 2021年 / 72卷 / 03期
关键词
Ship production process; Bernoulli production lines; Markov chains; Serial lines; Performance measures; Improvability; BERNOULLI PRODUCTION LINE; PERFORMANCE; MANAGEMENT;
D O I
10.21278/brod72302
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
The ship production process is a complex manufacturing system involving numerous working stations mutually interconnected by transport devices and buffers. Such a production system can be efficiently modeled using the stochastic system approach and Markov chains. Once formulated, the mathematical model enables analysis of the governing production system properties like the production rate, work-in-process, and probabilities of machine blockage and starvation that govern the production system bottleneck identification and its continuous improvement. Although the continuous improvement of the production system is a well-known issue, it is usually based on managerial intuition or more complex discrete event simulation yielding sub-optimal results. Therefore, a semi-analytical procedure for the improvability analysis using the Markov chain framework is presented in this paper in the case of the shipyard's fabrication lines. Potential benefits for the shipyards are pointed out as the main gain of the improvability analysis.
引用
收藏
页码:13 / 28
页数:16
相关论文
共 26 条
[11]  
Hadzic N., 2020, SHIP PRODUCTION 2
[12]   Analytical Solution of the serial Bernoulli production line steady-state performance and its application in the shipbuilding process [J].
Hadzic, Neven .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (04) :1052-1065
[13]  
Li J, 2009, PRODUCTION SYSTEMS ENGINEERING, P1, DOI 10.1007/978-0-387-75579-3
[14]   HOMOGENEOUS, ASYMPTOTICALLY RELIABLE SERIAL PRODUCTION LINES - THEORY AND A CASE-STUDY [J].
LIM, JT ;
MEERKOV, SM ;
TOP, F .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1990, 35 (05) :524-534
[15]  
Ljubenkov B, 2008, STROJ VESTN-J MECH E, V54, P131
[16]   CURRENT APPROACHES TO THE MANAGEMENT OF NAVAL SHIPBUILDING PROJECTS [J].
Ljulj, Andrija ;
Slapnicar, Vedran ;
Grubisc, Izvor .
BRODOGRADNJA, 2021, 72 (01) :95-107
[17]  
Longdale D., 2016, SNAME MAR CONV 1 5 N
[18]   Accuracy of Semi-Analytical and Numerical Approaches in the Evaluation of Serial Bernoulli Production Lines [J].
Lozar, Viktor ;
Hadzic, Neven ;
Opetuk, Tihomir ;
Slapnicar, Vedran .
MATHEMATICS, 2021, 9 (13)
[19]  
McLean C, 2001, WSC'01: PROCEEDINGS OF THE 2001 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, P870, DOI 10.1109/WSC.2001.977386
[20]  
Moore RC, 2007, SHIP PRODUCTION