Exact and heuristic approaches for joint maintenance and spare parts planning

被引:17
作者
Bulbul, Pinar [1 ]
Bayindir, Z. Pelin [1 ]
Bakal, Ismail Serdar [1 ]
机构
[1] Middle East Tech Univ, Dept Ind Engn, Ankara, Turkey
关键词
Preventive replacement; Spare part inventory management; Dynamic programming; CONDITION-BASED REPLACEMENT; PREVENTIVE MAINTENANCE; PROVISIONING POLICY; BLOCK-REPLACEMENT; AGE REPLACEMENT; INVENTORY OPTIMIZATION; INTEGRATED DECISION; SYSTEMS; STOCKING; STRATEGY;
D O I
10.1016/j.cie.2019.01.032
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this study, we consider the joint problem of preventive replacement and spare parts inventory planning. We present an exact dynamic programming formulation to minimize the total expected cost over a finite planning horizon. As it is not possible to represent the optimal solution by a well-defined and practical policy, and the dynamic programming recursion is time-consuming to apply, we propose three heuristic approaches that are easy to understand and to implement in practice: (i) Steady-State Approximation, (ii) Stationary Policy and (iii) Myopic Approach. Through computational analyses, we investigate the effects of the model parameters on the performances of the proposed heuristics.
引用
收藏
页码:239 / 250
页数:12
相关论文
共 50 条
[1]   JOINTLY OPTIMAL BLOCK-REPLACEMENT AND SPARE PROVISIONING POLICY [J].
ACHARYA, D ;
NAGABHUSHANAM, G ;
ALAM, SS .
IEEE TRANSACTIONS ON RELIABILITY, 1986, 35 (04) :447-451
[2]  
[Anonymous], 2 EUR C PROGN HLTH M
[3]  
Armstrong MJ, 1998, IIE TRANS, V30, P143, DOI 10.1080/07408179808966446
[4]   Joint optimization of maintenance and inventory policies for a simple system [J].
Armstrong, MJ ;
Atkins, DR .
IIE TRANSACTIONS, 1996, 28 (05) :415-424
[5]  
Basten R.J. I., 2014, Surveys in Operations Research and Management Science, V19, P34, DOI [10.1016/j.sorms.2014.05.002, DOI 10.1016/J.SORMS.2014.05.002]
[6]   A proactive event-driven decision model for joint equipment predictive maintenance and spare parts inventory optimization [J].
Bousdekis, Alexandros ;
Papageorgiou, Nikos ;
Magoutas, Babis ;
Apostolou, Dimitris ;
Mentzas, Gregoris .
PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE IN THROUGH-LIFE ENGINEERING SERVICES, 2017, 59 :184-189
[7]   Joint optimization of block-replacement and periodic-review spare-provisioning policy [J].
Brezavscek, A ;
Hudoklin, A .
IEEE TRANSACTIONS ON RELIABILITY, 2003, 52 (01) :112-117
[8]   Spare provisioning strategy for preventively replaced systems subjected to random failure [J].
Chelbi, A ;
Aït-Kadi, D .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 74 (1-3) :183-189
[9]   JOINT OPTIMIZATION OF REPLACEMENT AND SPARE ORDERING FOR CRITICAL ROTARY COMPONENT BASED ON CONDITION SIGNAL TO DATE [J].
Chen, Xiaohui ;
Xu, Dawei ;
Xiao, Lei .
EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2017, 19 (01) :76-85
[10]   Modelling and numerical assessment of a maintenance strategy with stock through piecewise deterministic Markov processes and quasi Monte Carlo methods [J].
Demgne, Jeanne ;
Mercier, Sophie ;
Lair, William ;
Lonchampt, Jerome .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2017, 231 (04) :429-445