Understanding Air Pollution from Induced Traffic during and after the Construction of a New Highway: Case Study of Highway 25 in Montreal

被引:7
作者
Amin, Md. Shohel Reza [1 ]
Tamima, Umma [2 ]
Jimenez, Luis Amador [2 ]
机构
[1] Coventry Univ, Fac Engn Environm & Comp, Civil Engn Highways & Transportat Engn, Priory St, Coventry CV1 5FB, W Midlands, England
[2] Concordia Univ, Dept Bldg Civil & Environm Engn, 1515 St Catherine Ouest, Montreal, PQ H3G 1M8, Canada
关键词
TRAVELER INFORMATION-SYSTEMS; EQUILIBRIUM ASSIGNMENT; MARKET PENETRATION; URBAN; EMISSIONS;
D O I
10.1155/2017/5161308
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study demonstrates through a case study that detailed analyses, even after the construction of a project, are feasible using current technologies and available data. A case study of highway 25 is used to illustrate the method and verify the levels of air contaminants from additionally induced traffic during and after the construction of highway. Natural traffic growth was removed from the effect of observed gas emissions by comparing observed levels on other further locations in the same metropolitan area. This study estimates air pollution from the additional traffic during and after the construction of A-25 extension project. NO2 levels were spatially interpolated during peak and off-peak hour traffic and traffic density simulated on the road network for four scenarios. Comparing the four scenarios, it was found that levels of NO2 concentrations were reduced at neighbor areas due to less traffic during the construction period. Levels of NO2 after the construction were higher than those in 2008. The simulated traffic density for four scenarios revealed that traffic density was significantly increased on both arterial and access roads within the close vicinity of the extension project during and after its construction.
引用
收藏
页数:14
相关论文
共 24 条
[11]   Comparison of spatial interpolation methods for estimating snow distribution in the Colorado Rocky Mountains [J].
Erxleben, J ;
Elder, K ;
Davis, R .
HYDROLOGICAL PROCESSES, 2002, 16 (18) :3627-3649
[12]  
FHWA, 2005, HIGHW PERF MON SYST
[13]  
Green Coalition, 2007, HIGHW 25 MEM COAL VE
[14]  
Groupe en Recheche Urbaine, 2007, PRES A25 SEC CONS PU
[15]   A comparative study of the emissions by road maintenance works and the disrupted traffic using life cycle assessment and micro-simulation [J].
Huang, Yue ;
Bird, Roger ;
Bell, Margaret .
TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2009, 14 (03) :197-204
[16]   Conformity: How VMT-speed distributions can affect mobile emission inventories [J].
Ito, DT ;
Niemeier, D ;
Garry, G .
TRANSPORTATION, 2001, 28 (04) :409-425
[17]   Algorithms for logit-based stochastic user equilibrium assignment [J].
Maher, M .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1998, 32 (08) :539-549
[18]  
Mannering F., 2013, Principles of highway engineering and traffic analysis, VFifth
[19]   Volatile organic compounds in some urban locations in United States [J].
Mohamed, MF ;
Kang, DW ;
Aneja, VP .
CHEMOSPHERE, 2002, 47 (08) :863-882
[20]   AN ALGORITHM FOR THE EQUILIBRIUM ASSIGNMENT PROBLEM WITH RANDOM LINK TIMES [J].
SHEFFI, Y ;
POWELL, WB .
NETWORKS, 1982, 12 (02) :191-207