Proactive approach to address robust batch process scheduling under short-term uncertainties

被引:0
作者
Bonfill, A [1 ]
Espuña, A [1 ]
Plugjaner, L [1 ]
机构
[1] Univ Politecn Catalunya, ETSEIB, Dept Chem Engn, E-08028 Barcelona, Spain
来源
European Symposium on Computer-Aided Process Engineering-15, 20A and 20B | 2005年 / 20a-20b卷
关键词
proactive schedule; rescheduling; robustness; uncertainty;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A contribution is made in the area of proactive scheduling with the aim to properly define the scheduling problem explicitly incorporating the effects of short-term uncertainties. The idea is to identify a robust initial schedule with the flexibility to react to unexpected events with minimum effects. The problem is modelled using a stochastic optimization approach where not only a set of anticipated scenarios can be considered, but also the capability to react to events once they Occur. A stochastic genetic algorithm is developed to efficiently identify robust schedules with minimum expectance for the wait times and idle times that commonly arise in the operation of batch processes with variable operation times and machine breakdowns. The application of the proposed modelling framework to different batch processes shows the flexibility of the identified initial schedule and highlights the importance of exploiting the information of the uncertainty at the decision stage.
引用
收藏
页码:1057 / 1062
页数:6
相关论文
共 50 条
  • [31] Robust short-term load forecasting using projection statistics
    Chakhchoukh, Yacine
    Panciatici, Patrick
    Bondon, Pascal
    Mili, Lamine
    2009 3RD IEEE INTERNATIONAL WORKSHOP ON COMPUTATIONAL ADVANCES IN MULTI-SENSOR ADAPTIVE PROCESSING (CAMSAP), 2009, : 45 - 48
  • [32] Robust short-term load forecasting using projection statistics
    Chakhchoukh, Yacine
    Panciatici, Patrick
    Bondon, Pascal
    Mili, Lamine
    2009 3RD IEEE INTERNATIONAL WORKSHOP ON COMPUTATIONAL ADVANCES IN MULTI-SENSOR ADAPTIVE PROCESSING (CAMSAP 2009), 2009, : 45 - +
  • [33] Production scheduling of a large-scale industrial continuous plant: Short-term and medium-term scheduling
    Shaik, Munawar A.
    Floudas, Christodoulos A.
    Kallrath, Josef
    Pitz, Hans-Joachim
    COMPUTERS & CHEMICAL ENGINEERING, 2009, 33 (03) : 670 - 686
  • [34] Short-term operation of microgrids with thermal and electrical loads under different uncertainties using information gap decision theory
    Kia, M.
    Shafiekhani, M.
    Arasteh, H.
    Hashemi, S. M.
    Shafie-khah, M.
    Catalao, J. P. S.
    ENERGY, 2020, 208
  • [35] Frequency Constrained Scheduling Under Multiple Uncertainties via Data-Driven Distributionally Robust Chance-Constrained Approach
    Yang, Lun
    Li, Zhihao
    Xu, Yinliang
    Zhou, Jianguo
    Sun, Hongbin
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2023, 14 (02) : 763 - 776
  • [36] A Robust Optimization Approach to Postdisaster Relief Logistics Planning Under Uncertainties
    Liu, Yajie
    Jiang, Ping
    2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 194 - 198
  • [37] Risk Assessment of Short-term Hydropower Scheduling under Price Uncertainty Considering Correlation Between Adjacent Intervals
    He, Li
    Quan, Yi
    He, Ming
    IECON 2014 - 40TH ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY, 2014, : 2233 - 2238
  • [38] Stochastic Programming Models for Short-Term Power Generation Scheduling and Bidding
    Kristoffersen, Trine Krogh
    Fleten, Stein-Erik
    ENERGY, NATURAL RESOURCES AND ENVIRONMENTAL ECONOMICS, 2010, : 187 - +
  • [39] When Robust Statistics Meets with Robust Optimization: Data-Driven Batch Process Scheduling in The Presence of Outliers
    Ning, Chao
    You, Fengqi
    27TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT C, 2017, 40C : 2263 - 2268
  • [40] A robust modeling approach for regional water management under multiple uncertainties
    Li, Y. P.
    Huang, G. H.
    Nie, S. L.
    Chen, X.
    AGRICULTURAL WATER MANAGEMENT, 2011, 98 (10) : 1577 - 1588