Robustness in the Optimization of Risk Measures

被引:12
|
作者
Embrechts, Paul [1 ,2 ]
Schied, Alexander [3 ]
Wang, Ruodu [3 ]
机构
[1] Swiss Fed Inst Technol, Dept Math, CH-8092 Zurich, Switzerland
[2] Swiss Fed Inst Technol, ETH Risk Ctr, CH-8092 Zurich, Switzerland
[3] Univ Waterloo, Dept Stat & Actuarial Sci, Waterloo, ON N2L 3G1, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
robustness; value-at-risk; expected shortfall; optimization; financial regulation; UNCERTAINTY; ECONOMICS;
D O I
10.1287/opre.2021.2147
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We study issues of robustness in the context of Quantitative Risk Management and Optimization. We develop a general methodology for determining whether a given risk-measurement-related optimization problem is robust, which we call "robustness against optimization." The new notion is studied for various classes of risk measures and expected utility and loss functions. Motivated by practical issues from financial regulation, special attention is given to the two most widely used risk measures in the industry, Value-at-Risk (VaR) and Expected Shortfall (ES). We establish that for a class of general optimization problems, VaR leads to nonrobust optimizers, whereas convex risk measures generally lead to robust ones. Our results offer extra insight on the ongoing discussion about the comparative advantages of VaR and ES in banking and insurance regulation. Our notion of robustness is conceptually different from the field of robust optimization, to which some interesting links are derived.
引用
收藏
页码:95 / 110
页数:17
相关论文
共 50 条
  • [21] Tent Method, optimization and robustness
    Boltyanski, V
    OPTIMAL CONTROL APPLICATIONS & METHODS, 2004, 25 (04) : 181 - 210
  • [22] Robustness Measures for Operation Schedules Subject to Disruptions
    Karri, Badarinath
    Srinivasan, Rajagopalan
    Karimi, I. A.
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2009, 48 (20) : 9204 - 9214
  • [23] On Robustness in Optimization-Based Constrained Iterative Learning Control
    Liao-McPherson, Dominic
    Balta, Efe C.
    Rupenyan, Alisa
    Lygeros, John
    IEEE CONTROL SYSTEMS LETTERS, 2022, 6 : 2846 - 2851
  • [24] Continuous valuations of temporal logic specifications with applications to parameter optimization and robustness measures
    Rizk, Aurelien
    Batt, Gregory
    Fages, Francois
    Soliman, Sylvain
    THEORETICAL COMPUTER SCIENCE, 2011, 412 (26) : 2827 - 2839
  • [25] Data-Driven Optimization of Reward-Risk Ratio Measures
    Ji, Ran
    Lejeune, Miguel A.
    INFORMS JOURNAL ON COMPUTING, 2021, 33 (03) : 1120 - 1137
  • [26] A statistical method for assessing retrofitting measures of buildings and ranking their robustness against climate change
    Nik, Vahid M.
    Mata, Erika
    Kalagasidis, Angela Sasic
    ENERGY AND BUILDINGS, 2015, 88 : 262 - 275
  • [27] Investigation of surrogate measures of robustness for project scheduling problems
    Zahid, Taiba
    Agha, Mujtaba Hassan
    Schmid, Thorsten
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 129 : 220 - 227
  • [28] Information Entropy and Measures of Market Risk
    Pele, Daniel Traian
    Lazar, Emese
    Dufour, Alfonso
    ENTROPY, 2017, 19 (05)
  • [29] Solving the robustness puzzle: The joint impact of optimization approach, robustness metrics, and scenarios on water resources management under deep uncertainty
    Huang, Jiajia
    Sangiorgio, Matteo
    Wu, Wenyan
    Maier, Holger R.
    Wang, Quan J.
    Hughes, Justin
    Castelletti, Andrea
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2025, 373
  • [30] The applicability of robustness measures to water resources decision making
    Hyde, KM
    Maier, HR
    Colby, CB
    MODSIM 2003: INTERNATIONAL CONGRESS ON MODELLING AND SIMULATION, VOLS 1-4: VOL 1: NATURAL SYSTEMS, PT 1; VOL 2: NATURAL SYSTEMS, PT 2; VOL 3: SOCIO-ECONOMIC SYSTEMS; VOL 4: GENERAL SYSTEMS, 2003, : 1639 - 1644