Multistage Stochastic Programming Model of Portfolio Selection for Life Insurance Companies in China

被引:0
作者
Qu, Ran [1 ]
Qu, Zhenting [2 ]
机构
[1] Jilin Univ, Sch Management, Changchun 130023, Peoples R China
[2] Chinalife Insurance Co, Branch of JiLin, Changchun, Peoples R China
来源
2009 INTERNATIONAL CONFERENCE ON BUSINESS INTELLIGENCE AND FINANCIAL ENGINEERING, PROCEEDINGS | 2009年
关键词
portfolio; life insrance; multistage stochastic programming; scenario generation; financial market; OPTIMIZATION;
D O I
10.1109/BIFE.2009.70
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
In order to help Chinese life insurance companies effectively make their portfolio selection. A portfolio selection model was established by using the method of multistage stochastic programming in this paper. In this model the management and supervision reality of Chinese life insurance industry were transferred into constraints. The quarterly return rate data of Chinalife' investment and that of the assets in Chinese financial markets were gathered from 2004 to the first two quarters in 2008. A scenario tree was established by using these data. Benders Decomposition Algorithm was chosen to solve this model. Then the model was used to construct a series of portfolio for China life in 2009. The portfolio showed that China life should maintain over 70% of risk-free assets and less than 30% risk assets to achieve its objective of benefit and security. Also its insurance business should be concerned.
引用
收藏
页码:274 / 278
页数:5
相关论文
共 47 条
[41]   Power System Portfolio Selection and CO2 Emission Management Under Uncertainty Driven by a DNN-Based Stochastic Model [J].
Mari, Carlo ;
Lucheroni, Carlo ;
Sinha, Nabangshu ;
Mari, Emiliano .
MATHEMATICS, 2025, 13 (09)
[42]   A two-stage interval-stochastic programming model for planning end-of-life vehicles allocation under uncertainty [J].
Simic, Vladimir .
RESOURCES CONSERVATION AND RECYCLING, 2015, 98 :19-29
[43]   An air quality index-based multistage type-2-fuzzy interval-stochastic programming model for energy and environmental systems management under multiple uncertainties [J].
Suo, C. ;
Li, Y. P. ;
Sun, J. ;
Yin, S. .
ENVIRONMENTAL RESEARCH, 2018, 167 :98-114
[44]   A novel mathematical programming model for multi-mode project portfolio selection and scheduling with flexible resources and due dates under interval-valued fuzzy random uncertainty [J].
Zolfaghari, Samaneh ;
Mousavi, Seyed Meysam .
EXPERT SYSTEMS WITH APPLICATIONS, 2021, 182
[45]   A simulation-based two-stage interval-stochastic programming model for water resources management in Kaidu-Konqi watershed, China [J].
Huang, Yue ;
Chen, Xi ;
Li, YongPing ;
Bao, AnMing ;
Ma, YongGang .
JOURNAL OF ARID LAND, 2012, 4 (04) :390-398
[46]   A simulation-based two-stage interval-stochastic programming model for water resources management in Kaidu-Konqi watershed,China [J].
Yue HUANGXi CHENYongPing LIAnMing BAOYongGang MA College of Urban and Environmental SciencesPeking UniversityBeijing China State Key Laboratory of Desert and Oasis EcologyXinjiang Institute of Ecology and GeographyChinese Academy of SciencesUrumqi China MOE Key Laboratory of Regional Energy Systems OptimizationSinoCanada Resources and Environmental Research AcademyNorth China Electric Power UniversityBeijing China Xinjiang Remote Sensing CenterUrumqi China .
Journal of Arid Land, 2012, 4 (04) :390-398
[47]   Application of a Fuzzy Two-Stage Chance Constrained Stochastic Programming Model for Optimization of the Ecological Services Value of the Interconnected River System Network Project in the Western Jilin Province, China [J].
Cai, Baofeng ;
Meng, Chong ;
Wang, Xian'en ;
Li, Yu .
WATER, 2019, 11 (01)