Source-Network-Storage Joint Planning Considering Energy Storage Systems and Wind Power Integration

被引:27
作者
Wu, Xiaosheng [2 ]
Jiang, Yuewen [1 ]
机构
[1] Fuzhou Univ, Coll Elect Engn & Automat, Fuzhou 350108, Peoples R China
[2] Fujian Key Lab New Energy Generat & Power Convers, Fuzhou 350108, Peoples R China
关键词
Energy storage system; linear programming; transmission grid expansion planning; unit commitment; wind power integration; TRANSMISSION; CURTAILMENT; AC; OPTIMIZATION; INVESTMENT; CHALLENGES;
D O I
10.1109/ACCESS.2019.2942134
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
With the large-scale grid integration of wind power, the inherent space-time characteristics of wind power and the transmission congestion seriously restrict the consumption of wind power and the development of demand. In order to improve the wind power accommodation and load acceptance level, the joint planning including the wind power installed capacity and location, the transmission network expansion, and energy storage system locating and sizing is considered. The generation-side operation process and the charging-discharging strategy of energy storage systems are also involved. The source-network-storage joint planning model is established with the goal of minimizing the cost of the transmission network expansion, the construction and operation of energy storage systems, the conventional units' operation, the wind curtailment, and the heavy-load penalty. Furthermore, the energy storage system planning & operation constraints, the heavy-load operation constraints and the quadratic generation cost function are linearized in the MILP model. Through the Wood&Wollenberg 6-bus system, the IEEE RTS-24 test system, and the modified IEEE 118-bus system as the test systems, the joint planning schemes under multiple scenarios are compared and analyzed. The results show that the proposed planning model can effectively improve the load acceptance capability and wind power integration level.
引用
收藏
页码:137330 / 137343
页数:14
相关论文
共 40 条
[1]   Transmission network expansion planning considering load correlation using unscented transformation [J].
Abbasi, Shahriar ;
Abdi, Hamdi ;
Bruno, Sergio ;
La Scala, Massimo .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2018, 103 :12-20
[2]   Battery energy storage systems in transmission network expansion planning [J].
Aguado, J. A. ;
de la Torre, S. ;
Trivino, A. .
ELECTRIC POWER SYSTEMS RESEARCH, 2017, 145 :63-72
[3]   Efficient Benders cuts for transmission expansion planning [J].
Alizadeh-Mousavi, Omid ;
Zima-Bockarjova, Marija .
ELECTRIC POWER SYSTEMS RESEARCH, 2016, 131 :275-284
[4]  
[Anonymous], 1985, 8504 SOL STANF U
[5]   Transmission expansion planning with AC model based on generalized Benders decomposition [J].
Asadamongkol, Somphop ;
Eua-arporn, Bundhit .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2013, 47 :402-407
[6]   Wind and solar energy curtailment: A review of international experience [J].
Bird, Lori ;
Lew, Debra ;
Milligan, Michael ;
Carlini, E. Maria ;
Estanqueiro, Ana ;
Flynn, Damian ;
Gomez-Lazaro, Emilio ;
Holttinen, Hannele ;
Menemenlis, Nickie ;
Orths, Antje ;
Eriksen, Peter Borre ;
Smith, J. Charles ;
Soder, Lennart ;
Sorensen, Poul ;
Altiparmakis, Argyrios ;
Yasuda, Yoh ;
Miller, John .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2016, 65 :577-586
[7]   A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem [J].
Carrion, Miguel ;
Arroyo, Jose M. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (03) :1371-1378
[8]   Optimal Siting and Sizing of Used Battery Energy Storage Based on Accelerating Benders Decomposition [J].
Chen, Dapeng ;
Jing, Zhaoxia ;
Tan, Huijuan .
IEEE ACCESS, 2019, 7 :42993-43003
[9]   Long-term Coordination of Transmission and Storage to Integrate Wind Power [J].
Conejo, Antonio J. ;
Cheng, Yaohua ;
Zhang, Ning ;
Kang, Chongqing .
CSEE JOURNAL OF POWER AND ENERGY SYSTEMS, 2017, 3 (01) :36-43
[10]   Security constrained AC transmission network expansion planning [J].
Das, Soumya ;
Verma, Ashu ;
Bijwe, P. R. .
ELECTRIC POWER SYSTEMS RESEARCH, 2019, 172 :277-289