The applicability of leak-before-break on flooded member detection for offshore structures under fatigue

被引:8
作者
Kou, K. P. [1 ]
Burdekin, F. M.
机构
[1] Univ Macau, Dept Civil & Environm Engn, Macau, SAR, Peoples R China
[2] Univ Manchester, Manchester M13 9PL, Lancs, England
关键词
flooded member detection; leak-before-break; crack growth;
D O I
10.1016/j.engfracmech.2007.03.018
中图分类号
O3 [力学];
学科分类号
08 ; 0801 ;
摘要
The full development of growth of a circumferential crack in a tubular member from a long deep surface crack to final failure has been investigated by carrying out fracture mechanics based fatigue analyses, including the stage of a partial through-wall crack. The influences of member size, crack configuration material properties and loading conditions on the fatigue life have also been explored. The time available to detect the presence of the crack once it has penetrated the wall thickness (the flooded life) depends particularly on the rate of accumulation of fatigue damage ((SN)-N-3/year) and on the initial length of surface crack present. The analysis results have been applied to a case study of a particular offshore structure and loading situation and found to support inspection intervals of three years for flooded member detection for this case. The results of this fatigue analyses, have been compared to a conventional leak-before-break (LBB) procedure in flooded member detection. It was found that, for long deep cracks, the standard LBB procedure may underestimate the flooded life available for inspection, but for short cracks a standard LBB approach using extrapolations of standard stress intensity factor solutions would be non conservative. (C) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:31 / 40
页数:10
相关论文
共 46 条
  • [1] Leak-before-break: Global perspectives and procedures
    Bourga, R.
    Moore, P.
    Janin, Y. -J.
    Wang, B.
    Sharples, J.
    INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 2015, 129 : 43 - 49
  • [2] CRACK SHAPE DEVELOPMENT FOR LEAK-BEFORE-BREAK ANALYSIS IN PIPELINES
    Zhang, Kathy
    Xu, Luyao
    Ferguson, James
    Zadery, Dennis
    PROCEEDINGS OF THE 12TH INTERNATIONAL PIPELINE CONFERENCE, 2018, VOL 1, 2018,
  • [3] A thermomechanical finite element tool for Leak-before-Break analysis
    Gill, P.
    Davey, K.
    INTERNATIONAL JOURNAL FOR NUMERICAL METHODS IN ENGINEERING, 2014, 98 (09) : 678 - 702
  • [4] Leak-before-break analysis of a pipe containing circumferential defects
    Ren, X. B.
    Nyhus, B.
    Lange, H. L.
    Hauge, M.
    ENGINEERING FAILURE ANALYSIS, 2015, 58 : 369 - 379
  • [5] LEAK-BEFORE-BREAK ANALYSIS OF THERMALLY AGED NUCLEAR PIPE UNDER DIFFERENT BENDING MOMENTS
    Lv, Xuming
    Li, Shilei
    Zhang, Hailong
    Wang, Yanli
    Wang, Zhaoxi
    Xue, Fei
    Wang, Xitao
    NUCLEAR ENGINEERING AND TECHNOLOGY, 2015, 47 (06) : 712 - 718
  • [6] Effect of the Joule-Thomson Cooling on the Leak-Before-Break Approach
    Ai, G.
    Liu, Y. H.
    PRESSURE VESSEL TECHNOLOGY: PREPARING FOR THE FUTURE, 2015, 130 : 1343 - 1358
  • [7] Effect of the Joule-Thomson cooling on the leak-before-break approach
    Ai, Gang
    Ng, Heong Wah
    Liu, Yinghua
    INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 2016, 139 : 96 - 106
  • [8] CRACK OPENING AREA OF PRESSURIZED PIPE FOR LEAK-BEFORE-BREAK EVALUATION
    HASEGAWA, K
    OKAMOTO, A
    YOKOTA, H
    YAMAMOTO, Y
    SHIBATA, K
    OSHIBE, T
    MATSUMURA, K
    JSME INTERNATIONAL JOURNAL SERIES I-SOLID MECHANICS STRENGTH OF MATERIALS, 1991, 34 (03): : 332 - 338
  • [9] Application of Probabilistic Leak-Before-Break for WWER-1000 Unit
    Dubyk, Yaroslav
    FIRST INTERNATIONAL SYMPOSIUM ON RISK ANALYSIS AND SAFETY OF COMPLEX STRUCTURES AND COMPONENTS (IRAS 2019), 2019, 22 : 275 - 282
  • [10] Effect of nozzle geometry on leak-before-break analysis of pressurised piping
    Huh, NS
    Kim, YJ
    Kim, YJ
    Yu, YJ
    Pyo, CR
    ENGINEERING FRACTURE MECHANICS, 2001, 68 (16) : 1709 - 1722