Optimal Hedging of Commodity Price Risks in Highway Contracts

被引:5
作者
Zhou, Xue [1 ]
Damnjanovic, Ivan D. [1 ]
机构
[1] Texas A&M Univ, Zachry Dept Civil Engn, College Stn, TX 77843 USA
关键词
TIME-COST OPTIMIZATION; GENETIC ALGORITHMS; MULTIOBJECTIVE APPROACH; CONSTRUCTION; MODELS;
D O I
10.3141/2228-03
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Macroeconomic conditions, such as commodity prices, labor wages, and inflation rates, affect the cost of construction projects. In a volatile market environment, highway agencies often pass such risks to contractors by using fixed-price contracts. In turn, contractors respond by adding premiums in bid prices. How much of this risk highway agencies should pass to contractors is the topic of this paper. More specifically, the objective of this paper is to develop a model that can help highway agencies manage cost risks associated with commodity prices. The weighted least squares regression model is used to estimate the risk premium; the solution to a multiobjective optimization formulation considers a genetic algorithm approach to nonconvex optimization. Crude oil prices are used as an example of volatile commodities. The results of this study suggest that the optimal risk mitigation actions are conditional on owners' risk preferences.
引用
收藏
页码:19 / 25
页数:7
相关论文
共 34 条
[31]  
*TX DEP TRANSP, HIGHW COST IND 1997
[32]   Estimating future highway construction costs [J].
Wilmot, CG ;
Cheng, G .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (03) :272-279
[33]   Applying a genetic algorithm-based multiobjective approach for time-cost optimization [J].
Zheng, DXM ;
Ng, ST ;
Kumaraswamy, MM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (02) :168-176
[34]  
Zhi H., 1995, INT J PROJ MANAG, V13, P231, DOI [DOI 10.1016/0263-7863(95)00015-I, 10.1016/0263-7863, DOI 10.1016/0263-7863]