共 34 条
[1]
*AASHTO AASHTO SUB, 2009, SURV US PRIC ADJ CLA
[2]
*AASHTO AASHTO SUB, 2008, SURV US PRIC ADJ CLA
[3]
Al-Tabtabai H., 1999, ENG CONSTR ARCHIT MA, V6, P121, DOI [10.1108/eb021105, DOI 10.1108/EB021105]
[4]
Baloi D., 2003, International Journal of Project Management, V21, P261, DOI 10.1016/S0263-7863(02)00017-0
[5]
Probabilistic monitoring of project performance using SS-curves
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2000, 126 (02)
:142-148
[7]
Construction resource scheduling with genetic algorithms
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1996, 122 (02)
:125-132