Experimental and analytical study on longitudinal joint opening of concrete segmental lining

被引:119
作者
Li, Xiaojun [1 ]
Yan, Zhiguo [1 ]
Wang, Zhen [1 ]
Zhu, Hehua [1 ]
机构
[1] Tongji Univ, Dept Geotech Engn, Shanghai 200092, Peoples R China
基金
中国国家自然科学基金;
关键词
Concrete segmental lining; Longitudinal joint; Joint opening; Full-scale test; Ultimate limit state; TUNNEL LININGS;
D O I
10.1016/j.tust.2014.11.002
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Longitudinal joint opening is a common distress in shield tunnel operation. Existing longitudinal joint models are mainly developed for the design of segmental lining, but the real behavior of longitudinal joints in operational tunnels may exceed the normal design range. The aims of this paper are to study the development of longitudinal joint opening with bending moment under different axial stress levels, and investigate the longitudinal joint opening in the Ultimate Limit State (ULS). Firstly, full-scale tests on the longitudinal joints that are adopted in the Shanghai Metro Line No. 13 are conducted. The longitudinal joints are continuously loaded until completely damaged. Secondly, based on the test observations, a progressive model is proposed to predict the mechanical behavior of the joint. The proposed model is then verified by the test results. Lastly, using the proposed model, the influences of the axial stress level, bolt pretightening force, concrete delamination depth and bolt corrosion depth on the mechanical behavior of the joint are investigated. The following conclusions are drawn from the analysis: (1) Longitudinal joint opening is highly dependent on the axial stress level. For the joint subjected to the same bending moment, the larger the axial load, the smaller the joint opening. (2) Generally, the joint opening decreases with the increasing of bolt pretightening force, and increases with the increasing of concrete delamination depth and bolt corrosion depth. (3) The joint opening in the ULS increases with the increasing of axial load for the sagging moment case, and decreases for the hogging moment case. The structural state based on joint opening and the effects of joint configuration are also discussed. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:52 / 63
页数:12
相关论文
共 22 条
[1]  
[Anonymous], 2010, GB50010
[2]  
[Anonymous], 2010, DGJ0811
[3]   Experimental and analytical study of the structural response of segmental tunnel linings based on an in situ loading test. Part 2: Numerical simulation [J].
Arnau, Oriol ;
Molins, Climent .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2011, 26 (06) :778-788
[4]  
Blom CBM, 2000, THESIS TU DELFT DELF
[5]  
Collins MP., 1997, PRESTRESSED CONCRETE
[6]   Full-scale testing and modeling of the mechanical behavior of shield TBM tunnel joints [J].
Ding, Wen-qi ;
Peng, Yi-cheng ;
Yan, Zhi-guo ;
Shen, Bi-wei ;
Zhu, He-hua ;
Wei, Xin-xin .
STRUCTURAL ENGINEERING AND MECHANICS, 2013, 45 (03) :337-354
[7]   Analysis of shield tunnel [J].
Ding, WQ ;
Yue, ZQ ;
Tham, LG ;
Zhu, HH ;
Lee, CF ;
Hashimoto, T .
INTERNATIONAL JOURNAL FOR NUMERICAL AND ANALYTICAL METHODS IN GEOMECHANICS, 2004, 28 (01) :57-91
[8]   Approximate evaluation of stresses in degraded tunnel linings [J].
El Naggar, Hany ;
Hinchberger, Sean D. .
SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2012, 43 :45-57
[9]   An analytical solution for jointed tunnel linings in elastic soil or rock [J].
El Naggar, Hany ;
Hinchberger, Sean D. .
CANADIAN GEOTECHNICAL JOURNAL, 2008, 45 (11) :1572-1593
[10]  
*JSCE, 2000, JAP STAND SHIELD TUN