Key Drivers for Adopting Design-Build in Public Construction Projects: Malaysian Perspective

被引:1
作者
Lee, Zheng Ping [1 ]
Rahman, Rahimi A. [1 ,2 ]
Doh, Shu Ing [3 ]
机构
[1] Univ Malaysia Pahang, Fac Civil Engn Technol, Pahang, Malaysia
[2] Univ Malaysia Pahang, Earth Resources & Sustainabil Ctr, Pahang, Malaysia
[3] Univ Malaysia Pahang, Coll Engn, Pahang, Malaysia
关键词
Construction industry; Design-build; Drivers; Developing countries; Public projects; CRITICAL SUCCESS FACTORS; TARGET COST CONTRACTS; GREEN PROCUREMENT; PERFORMANCE; STRATEGIES; DETERMINANTS; MANAGEMENT; CHINA; MODEL;
D O I
10.21315/jcdc2021.26.1.7
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Design-build (D-B) had been applied in many advanced countries because the delivery method improves construction project success. While several megaprojects in Malaysia have adopted D-B, it is still uncommon in the local construction industry. Therefore, understanding the key drivers that are affecting the acceptance or rejection of D-B is crucial. However, that information is lacking in the existing body of knowledge. Thus, this research addresses that issue by identifying the key drivers for adopting D-B in the Malaysian construction sector from the standpoint of the core project parties (e.g., project clients, consultants and contractors). Questionnaire survey data from 111 professionals with D-B experience were analysed using inferential statistics, including f-test and analysis of variance (ANOVA). The outcome shows that the key drivers for industry practitioner in Malaysia for adopting D-B are: (1) "Maximise the use of resources between project team members", (2) "Sharing of expertise (design and technical) with project team members", (3) "Well-organised project team structure", (4) "High success rate" and (5) "Dispute prevention during the construction stage". Also, there are no significant differences found in the drivers between different geographical regions and project parties. Based on the investigations, this study adds to the current assortment of information in capturing the key drivers and providing an in-depth understanding of the underlying components for adopting D-B in Malaysia. Researchers and industry practitioners can use the findings to enhance the level of D-B adoption strategically.
引用
收藏
页码:131 / 160
页数:30
相关论文
共 116 条
[1]  
Abd El-Karim Mohamed Sayed Bassiony Ahmed, 2017, HBRC Journal, V13, P202, DOI 10.1016/j.hbrcj.2015.05.001
[2]  
Abou Chakra Hadi, 2019, Journal of Industrial Engineering International, V15, pS147, DOI 10.1007/s40092-019-00323-1
[3]  
Akintoye A., 1994, CONSTR MANAG ECON, V12, P155
[4]  
Aljohani A., 2017, INT J INNOVATION MAN, V8, P137, DOI [DOI 10.18178/IJIMT.2017.8.2.717, 10.18178/ijimt.2017.8.2.717]
[5]  
Ando M, 2011, J ARCHITECTURE BUILD, V3, P18
[6]  
Ando M, 2016, 1 INT C CONSTR PROJ
[7]  
[Anonymous], 2012, J DESIGN BUILT ENV
[8]  
[Anonymous], 1993, BUILD RES INF, DOI DOI 10.1080/09613219308727272
[9]   Empirical Study of Factors Influencing Schedule Delays of Public Construction Projects in Burkina Faso [J].
Bagaya, Ousseni ;
Song, Jinbo .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (05)
[10]   Assessing the use of back translation: the shortcomings of back translation as a quality testing method [J].
Behr, Dorothee .
INTERNATIONAL JOURNAL OF SOCIAL RESEARCH METHODOLOGY, 2017, 20 (06) :573-584