Software agents situated in primary distribution networks: A cooperative system for fault and power restoration management

被引:19
作者
Baxevanos, Loarmis S. [1 ]
Labridis, Dirnitris P. [1 ]
机构
[1] Aristotle Univ Thessaloniki, Dept Elect & Comp Engn, Power Syst Lab, GR-54124 Thessaloniki, Greece
关键词
artificial intelligence; cooperative systems; power distribution protection; underground power distribution lines;
D O I
10.1109/TPWRD.2007.905463
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper, extended research upon the potentials of implementing distributed artificial intelligence technology to achieve high degrees of independency in distribution network protection and restoration processes is presented. The work that has already been done in the area of agent-based and/or knowledge-based applications and expert systems is briefly reviewed. The authors justify the need to distribute activities in contradiction to the centralized methodologies. A proper model of the real environment is introduced in order to define the designing parameters of a prototype agent entity, which is the part of a cooperative network-management system. The system's goal is to autonomously perform effective fault management upon medium-voltage power distribution lines. The structure of the agent entity is then described by means of the agent behaviors being implemented. The cooperative operations of the proposed system and its computer simulation are presented. Simulation results are being evaluated. Finally, general conclusive remarks are made.
引用
收藏
页码:2378 / 2385
页数:8
相关论文
共 18 条
[1]   Toward self-healing energy infrastructure systems [J].
Amin, M .
IEEE COMPUTER APPLICATIONS IN POWER, 2001, 14 (01) :20-28
[2]  
[Anonymous], CIRC SYST 2004 MWSCA
[3]   Implementing multiagent systems technology for power distribution network control and protection management [J].
Baxevanos, Ioannis S. ;
Labridis, Dimitris P. .
IEEE TRANSACTIONS ON POWER DELIVERY, 2007, 22 (01) :433-443
[4]  
Ferber J., 1999, MULTIAGENT SYSTEMS I, P8
[5]  
*FIPA SPEC, 2002, FIPA ACL MESS STRUCT
[6]   A new heuristic reconfiguration algorithm for large distribution systems [J].
Gomes, FV ;
Carneiro, S ;
Pereira, JLR ;
Vinagre, MP ;
Garcia, PAN ;
Araujo, LR .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (03) :1373-1378
[7]   A restoration aid expert system for distribution substations [J].
Lee, HJ ;
Park, YM .
IEEE TRANSACTIONS ON POWER DELIVERY, 1996, 11 (04) :1765-1770
[8]   AN EXPERT SYSTEM OPERATIONAL AID FOR RESTORATION AND LOSS REDUCTION OF DISTRIBUTION-SYSTEMS [J].
LIU, CC ;
LEE, SJ ;
VENKATA, SS .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (02) :619-626
[9]  
LU YYH, 1991, IEEE T POWER, V6, P366
[10]   A heuristic nonlinear constructive method for distribution system reconfiguration [J].
McDermott, TE ;
Drezga, I ;
Broadwater, RP .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (02) :478-483