Financing constraints of public-private partnership projects in India

被引:13
|
作者
Sinha, Ajit Kumar [1 ]
Jha, Kumar Neeraj [1 ]
机构
[1] Indian Inst Technol, Dept Civil Engn, New Delhi, India
关键词
Construction; Case study; Project management; Engineering;
D O I
10.1108/ECAM-06-2018-0237
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The purpose of this paper is to identify the problems faced by banks, lenders, financial institutions, public authority, developers and concessionaires in course of financing of public-private partnership (PPP) road projects. Subsequently, the reasons that contribute to these problems were analyzed to come up with recommendations for mitigation of these problems. Design/methodology/approach The methodology adopted is based on identification of financing problems and the reasons thereof, from a systematic and critical review of literature. Financing details including problems faced and reasons behind were extracted from details of one port, one airport and one road project. Data pertaining to financing of PPP road projects have been collected for completed (five projects) as well as projects under implementation (five projects) during a time interval of four months, starting from December 2018 to March 2019. The chosen three projects for case studies were executed in airport project at Kolkata in four years, offshore container terminal at Mumbai port in six years and Tuni Ankapali road project in three years. This period attains importance, as simultaneous progressive development and innovation in the PPP mode of project execution was taking place rapidly. Findings The commercial banks in India dominate in providing debt to the PPP infrastructure projects, especially in the road sector. The non-banking financial companies and other intermediaries were still in their infancy then, and a corporate bond market was growing steadily, though slowly. Financing problems faced by the developers resulted in unwarranted time and cost overruns emanating from delay in land acquisition and grant of approvals, with these being the two major barriers to private sector participation. Even schedule overrun finally resulted in increased construction and financing cost. Originality/value Demand for upgradation, building and expansion of transportation infrastructure (roads) exists to keep pace with economic development. Problems like lack of a developed market for financing, inadequate institutional capacity, lack of personnel having domain expertise and absence of exclusive legislation to govern the implementation of PPP road projects are encountered by the sponsors and developers. Delay in land acquisition and environment clearance inhibits any decisive action by the lenders and investors, as these two are integrally linked to the decisions to be taken with respect to the financing of projects. Investors and bankers are generally apprehensive of their investment getting locked in or ending up as non-performing assets. Identification and proposed mitigation of these problems may likely smoothen the rough edges for the financing of projects, resulting in smoother implementation.
引用
收藏
页码:246 / 269
页数:24
相关论文
共 50 条
  • [1] The attractiveness of public-private partnership for road projects in India
    Malek, Mohammed Shakil
    Zala, Laxmansinh
    JOURNAL OF PROJECT MANAGEMENT, 2022, : 111 - 120
  • [2] Modern Trends in Financing Infrastructure Projects in the Framework of Public-Private Partnership
    Yuzvovich, L., I
    Boytush, O. A.
    Pustovalova, L. M.
    PROCEEDINGS OF THE 2ND INTERNATIONAL SCIENTIFIC AND PRACTICAL CONFERENCE - MODERN MANAGEMENT TRENDS AND THE DIGITAL ECONOMY: FROM REGIONAL DEVELOPMENT TO GLOBAL ECONOMIC GROWTH (MTDE 2020), 2020, 138 : 752 - 759
  • [3] The Malaysian Public-Private Partnership (PPP): Financing the Tolled Highway Projects
    Alfan, Ervina
    ASIAN JOURNAL OF BUSINESS AND ACCOUNTING, 2010, 3 (02): : 121 - 143
  • [4] Financing Infrastructure Projects Through Public-Private Partnerships in India
    Ramakrishnan, T. S.
    TRANSPORTATION RESEARCH RECORD, 2014, (2450) : 118 - 126
  • [5] Arrangement of financing for highway infrastructure projects under the conditions of Public-Private Partnership
    Khmel, Vialeta
    Zhao, Shengchuan
    IATSS RESEARCH, 2016, 39 (02) : 138 - 145
  • [6] CORPORATE FINANCING OF PUBLIC-PRIVATE PARTNERSHIP PROJECTS: ASSESSMENT OF FINANCIAL OPPORTUNITIES AND RISKS
    Shuliuk, B.
    FINANCIAL AND CREDIT ACTIVITY-PROBLEMS OF THEORY AND PRACTICE, 2021, 3 (38): : 78 - 85
  • [7] Mechanisms of Innovative Projects Financing in the Culture Industry on the Basis of Public-private Partnership
    Malshina, Nataliya
    Firsova, Anna
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON JUDICIAL, ADMINISTRATIVE AND HUMANITARIAN PROBLEMS OF STATE STRUCTURES AND ECONOMIC SUBJECTS (JAHP 2018), 2018, 252 : 100 - 105
  • [8] Desirability rating analysis for debt financing of public-private partnership road projects
    Laishram, Boeing Singh
    Kalidindi, Satyanaranaya N.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (09) : 823 - 837
  • [9] Risk Factors in IT Public-Private Partnership Projects
    Ghribi, Souhir
    Hudon, Pierre-Andre
    Mazouz, Bachir
    PUBLIC WORKS MANAGEMENT & POLICY, 2019, 24 (04) : 321 - 343
  • [10] The execution of public-private partnership projects in the UAE
    Dulaimi, Mohammed Fadhil
    Alhashemi, Mohamed
    Ling, Florence Yean Yng
    Kumaraswamy, Mohan
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (04) : 393 - 402