Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization

被引:14
|
作者
Qi, Jian-Jun [1 ]
Liu, Ya-Jie [1 ]
Jiang, Ping [1 ]
Guo, Bo [1 ]
机构
[1] Natl Univ Def Technol, Coll Informat Syst & Management, Changsha 410073, Hunan, Peoples R China
基金
中国国家自然科学基金;
关键词
Project scheduling; Multi-mode resource availability cost problem; Schedule generation; Forward activity list; Modified particle swarm optimization; GENETIC ALGORITHM; SCATTER SEARCH; PROJECT;
D O I
10.1007/s10951-014-0374-0
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The resource availability cost problem (RACP) (Mohring, Operations Research, 32:89-120, 1984) is commonly encountered in project scheduling. RACP aims to minimize the resource availability cost of a project by a given project deadline. In this study, RACP is extended from a single mode to a multi-mode called multi-mode RACP (MMRACP), which is more complicated than RACP but more convenient in practice. To solve MMRACP efficiently, forward activity list (FAL), a schedule generation scheme, is proposed. Heuristic algorithms are designed according to the characteristics of FAL to repair infeasible solutions and to improve the fitness of the solution. Modified particle swarm optimization (MPSO), which combines the advantages of particle swarm optimization and scatter search, is proposed to make the search for the best solution efficient. Computational experiments involving 180 instances are performed to validate the performance of the proposed algorithm. The results reveal that MPSO using FAL is a very effective method to solve MMRACP.
引用
收藏
页码:285 / 298
页数:14
相关论文
共 34 条
  • [21] A multi-mode resource-constrained discrete time-cost tradeoff problem and its genetic algorithm based solution
    Peng Wuliang
    Wang Chengen
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (06) : 600 - 609
  • [22] A column generation based distributed scheduling algorithm for multi-mode resource constrained project scheduling problem
    Liu Changchun
    Xiang Xi
    Zhang Canrong
    Wang Qiang
    Zheng Li
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 125 : 258 - 278
  • [23] A MODIFIED MODELING APPROACH AND A HEURISTIC PROCEDURE FOR THE MULTI-MODE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM WITH ACTIVITY SPLITTING
    Faghih-Mohammadi, Fatemeh
    Seifi, Abbas
    Khalighi-Sikaroudi, Mohammad
    RAIRO-OPERATIONS RESEARCH, 2016, 50 (01) : 91 - 118
  • [24] A Particle Swarm Optimization Based on Priority Rule for Resource-Constrained Multi-Project Scheduling Problem
    Deng Lin-yi
    Wang Yun-long
    Lin Yan
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1038 - +
  • [25] A genetic algorithm-based method for solving multi-mode resource-constrained project scheduling problem in uncertain environment
    Khalilzadeh, Mohammad
    Hosseini, Seyyed Hajir
    Ghaeli, Reza
    JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 79 - 86
  • [26] Comparison Analysis of Genetic Algorithm Particle Swarm Optimization and Cuckoo Search in Solving Multi-Destination Travel Cost Optimization Model
    Jiang Lingke
    Ge Peng
    He Yonghuan
    Liao Zhixue
    Ren Peiyu
    INNOVATION, ENTREPRENEURSHIP AND STRATEGY IN THE ERA OF INTERNET, 2016, : 556 - 560
  • [27] An Effective Hybrid Algorithm Based on Particle Swarm Optimization with Migration Method for Solving the Multiskill Resource-Constrained Project Scheduling Problem
    Quoc, Huu Dang
    The, Loc Nguyen
    Doan, Cuong Nguyen
    APPLIED COMPUTATIONAL INTELLIGENCE AND SOFT COMPUTING, 2022, 2022
  • [28] Preemptive Multi-mode Resource-Constrained Discrete Time-Cost-Resource Optimization via Non-dominated Sorting Genetic Algorithm
    Ma, Wei-min
    Che, Yang-yang
    Ke, Hua
    PROCEEDINGS OF THE 6TH INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION, VOL 2: INNOVATION AND PRACTICE OF INDUSTRIAL ENGINEERING AND MANAGMENT, 2016, : 719 - 728
  • [29] Multi-objective flexible job-shop scheduling problem using modified discrete particle swarm optimization
    Huang, Song
    Tian, Na
    Wang, Yan
    Ji, Zhicheng
    SPRINGERPLUS, 2016, 5
  • [30] Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm
    Ghoddousi, Parviz
    Eshtehardian, Ehsan
    Jooybanpour, Shirin
    Javanmardi, Ashtad
    AUTOMATION IN CONSTRUCTION, 2013, 30 : 216 - 227